Home renovation works

The most common renovation mistakes

The most common mistakes are starting without a defined design, accepting quotes that cannot be compared, ignoring the cause of the home's problems, not contracting in writing and not following the works. Almost all of them can be avoided before the works begin, with planning, a complete quote and a contract.

By Sofia Silva6 August 20196 min read

The most common renovation mistakes

In short

  • The most expensive mistake is starting the works without a defined design.
  • Comparable quotes require the same specification of work and materials for every building contractor.
  • Treating the symptoms (stains, peeling paint) without finding the cause only postpones the problem.
  • A written contract and technical follow-up protect the Client during the works.
  • Thinking of the home as a whole avoids repeated works and duplicated logistics costs.
  • Planning temporary accommodation and a contingency margin saves a great deal of trouble.

Before the design: what often goes wrong

Lack of prior planning

Warning sign: you ask for quotes without having defined what you want to do.

Without a detailed specification, each building contractor prices something different and the proposals cannot be compared.

How to avoid it: write down what you want to do, with specific materials and equipment (brands, models and finishes). If you are not familiar with the market, it is normal to find it hard to decide, and that is where a design helps. The design specifies the work and materials, is approved by you and is the basis for the schedule of works that the building contractors price.

Not being guided by qualified, experienced professionals

Warning sign: you decide the technical solutions on your own, or you choose someone who does not show previous work.

Few people carry out works more than once in the same home. Risking an investment of this kind without people who do it every day is costly.

How to avoid it: choose professionals with a solid technical team, ask to see completed designs and works, and compare how consistent the answers you receive are. See also when to hire an architect.

Not thinking of the renovation as a whole

Warning sign: renovating one room now, another later and the rest with no plan.

Every set of works has its own logistics, which are always a fixed cost, and the home loses continuity of language.

How to avoid it: plan the whole home, even if you carry out the works in phases. A full renovation may pay off compared with several separate interventions.

Neglecting the home's defects

Warning sign: damp stains, flaking paint or cracks that "go away in summer".

Repairing the symptom does not solve the cause, and the defect may affect other rooms.

How to avoid it: identify where the problem comes from before choosing finishes. The renovation should get to the heart of the matter. Before buying or renovating, a technical due diligence helps you know the real condition of the property.

Quote and contract: where money is lost

Not getting a realistic quote

Warning sign: short quotes, with no demolition, tile removal, finishing details or cornices.

These are the "ghost works": they do not appear in the quote and come up later as additional works (trabalhos a mais). Some are unavoidable, because certain problems are only discovered with exploratory openings or once the home is empty.

How to avoid it: ask for itemised quotes listing all the work, and share the budget you have available to get proposals that fit it. Set aside a contingency margin. See how to compare renovation quotes and, for a starting figure, the renovation cost simulator.

Not formalising the building contract

Warning sign: verbal agreements, or a quote accepted by email as the only document.

Without a contract, the work, the materials, the timeframe, the payment terms and the guarantees are not described.

How to avoid it: sign a written contract with the building contractor, so that questions arising during the works have an answer. The contract is entered into between the Client and the building contractor, and spacelovers is not a party to it. Read the article on the building contract (contrato de empreitada).

Not framing the works correctly under the legislation in force

Warning sign: starting without knowing whether the works need a building permit (licença), a prior communication (comunicação prévia) or no control at all.

Works that are incorrectly framed can lead to stop-work orders (embargos) and other trouble.

How to avoid it: before the works, talk to an architect or a qualified professional who can frame them and tell you the steps to follow. See how licensing works.

During the works: where quality is gained or lost

Poor communication

Warning sign: the building contractor and the Client only talk when there are problems.

Building works are teamwork, and they cannot be carried out if the two parties do not communicate frequently.

How to avoid it: agree from the outset who talks to whom, through which channel and how often. A well-decided design reduces questions, because the materials and details are already defined before work starts. If the architect follows the works, this helps to keep a complete reading of the design and the sequence of work.

Not following the works

Warning sign: seeing the works only at the end.

There are adjustments and details that can only be resolved on site, and that is when the design team is useful.

How to avoid it: arrange technical follow-up. spacelovers provides technical assistance during construction.

Not being prepared to live through the works

Warning sign: thinking you can put up with living at home during the works.

However organised the workers are, there is always dust and rubble, and living at home in those conditions is difficult.

How to avoid it: for full renovations, arrange temporary accommodation and count it as a cost of the works. For partial works, plan how the home will remain usable.

Practical precautions to avoid these mistakes

Before asking for quotes

  • Set an investment ceiling. It avoids wasting time on work that will never fit the budget. The real cost is only defined once there is a design; the renovation cost simulator is for guidance, not a proposal.
  • Separate the essential from the desirable. Make a list of what must be done, what you would like to do and what can wait. If the total exceeds the ceiling, you know straight away what goes.
  • Define the materials. Without defined materials it is hard to know the cost, because the ranges on the market are very different. Decide on durability and maintenance, not only on the initial price.
  • Choose the timing. If you want the home ready by a certain date (a birth, a move, a sale), plan well in advance and check whether any work depends on the weather.
  • Assess the property and the building. Ask a professional to assess the installations (water supply, drainage, gas, electricity, telecommunications, heating and cooling) and the structure, which determines which demolitions are possible. Carry out exploratory openings in the walls and, if in doubt, consult a professional qualified to give an opinion. Consulting the building's works file (processo de obra) in the municipal archive can provide valuable information. In a major intervention, old water and drainage pipes may need replacing, and mechanical extraction in internal bathrooms, properly sized and with a suitable outlet, helps to reduce damp and mould.
  • Measure accurately. Precise measurements reduce deviations from the design and the quote. See on-site survey.

When choosing the building contractor

Ask for references: completed or ongoing works you can visit and contacts of previous Clients. Give every company the same information, so that you compare the same design and, if it makes sense, negotiate. See how to choose the construction company.

Neighbours, information to the municipal council, waste and noise

  • Neighbours and condominium. Let them know in advance: start date, noisiest work, service interruptions and the contact of the person responsible for the works. This is particularly important in multi-occupancy residential buildings.
  • Information to the municipal council. Works exempt from prior control also require the start of works to be reported to the municipal council (Câmara Municipal) (Article 80-A of Decree-Law No. 555/99, as currently in force), with the exceptions provided for by law. See works exempt from prior control (obras isentas de controlo prévio).
  • Waste. It is advisable to set out in writing, in the quote and in the building contract, who deals with the rubble and how.
  • Noise. Check with your municipality the hours permitted for noisy work.
  • Site visits. Arrange them with the building contractor and wear protective equipment (safety boots, gloves, goggles, high-visibility vest and helmet): a building site has hazards and rules to follow.

Checklist before you start

  1. There is a design and a defined specification of work and materials.
  2. The quotes are itemised and comparable.
  3. A contingency margin has been set aside.
  4. The causes of the defects have been identified.
  5. The legal framing of the works has been confirmed.
  6. There is a written contract with the building contractor.
  7. It has been agreed who follows the works.
  8. You have a plan for living through the works.

Frequently asked questions

What is the most expensive mistake in a renovation?

Starting the works without a defined design. Without a design, the quotes are not comparable and decisions are taken on site, when changing things already costs money.

How can cost overruns be avoided?

With a complete design, comparable quotes and a contingency margin.

Can I live at home during the renovation?

For partial works, sometimes yes, with precautions. For full renovations, as a rule no; plan temporary accommodation.

Should I renovate in phases?

It depends on the budget and on the home. Draw up an overall plan first, even if the works are carried out in stages, so that the interventions fit together.

Who chooses the building contractor?

The Client, who hires the building contractor directly. spacelovers can help prepare and compare the proposals. See selecting the building contractor.

Want to go further? See how a renovation project works and the apartment renovations page.

Photos: Charles Deluvio and Israel Andrade (Unsplash).

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.