How to budget for renovation works

To obtain a reliable quote for building works, start with the design. Without a defined scope and a bill of quantities, each building contractor prices different works and the figures cannot be compared. First define what you want to do, then request proposals based on the same documents.

By Sofia Silva25 September 20194 min read

How to budget for renovation works

In short

  • A reliable quote starts from a defined design: without one, you receive approximations, not quotes.
  • The bill of quantities ensures that all building contractors price the same work.
  • Allow a margin for unforeseen costs, especially in old buildings.
  • The quote for the works is not the total cost: there is the design, fees, equipment and furniture.
  • Payments should be linked to the progress of the works and set out in the contract.

What do you need to have defined before requesting quotes?

A building contractor can only give a serious price for something specific. Before requesting proposals, be clear about:

  • The spaces involved: the whole house or only some rooms, and whether the renovation is full or partial.
  • The area involved.
  • What stays and what changes: water, drainage, electricity and gas networks, floors, doors, windows, kitchen and bathrooms.
  • The level of finishes: materials, equipment and fitted joinery.
  • The address and the intended timing.

The more descriptive the request, the closer the figure will be to reality. Photos and a floor plan of the property, even an outdated one, help to understand what is possible.

If you are still at a very early stage, the renovation cost simulator gives you reference values for renovations in Lisbon and the Metropolitan Area. It is not a quote: it helps you see whether the idea fits within the planned investment. See also how to use an online renovation simulator and the difference between approximate figures and a quote.

How does spacelovers handle a request?

A simple contact is enough: by phone or through the Request a proposal form. We ask you to describe your ideas in as much detail as possible, because that description is what we use to prepare the conversation.

Then we arrange a meeting on site. We only present the design proposal after getting to know the property, its surroundings and the access to the site.

At that meeting, the limitations of the property and the ideas that are not possible are pointed out straight away. Work you had not anticipated, but which is a precondition for other work, also comes up. For example, in a bathroom, replacing the toilet or the shower tray may require work on the plumbing and the floor.

Next, we summarise your intentions and present the design proposal, with its stages. spacelovers is an architecture studio and is not a building contractor: quotes for the works are requested by the Client from the building contractors of their choice, based on the design and the bill of quantities. We provide technical assistance on the Client's behalf in the selection of the building contractor.

Why is the bill of quantities the basis for a comparable quote?

The bill of quantities (mapa de quantidades) is the list of all the work and materials in the design, chapter by chapter, with their measurements. It results from a design developed up to the detail design stage, with drawings and specifications. See what the detail design includes.

When all building contractors receive the same bill, each one only has to fill in the prices. As a result:

  • the proposals cover the same work;
  • it is clear what each company has included or left out;
  • you can discuss a chapter with the building contractor, or remove it, without redoing everything.

Without a bill, each company interprets the works in its own way, and the proposals arrive in different formats and with different scopes. In that case, what you receive are approximations, not quotes.

How to compare the proposals received?

Before looking at the total, check that the proposals price the same works. A lower proposal may contain less work, not better prices. Check whether each one includes:

  • demolition and rubble removal;
  • technical networks: water, drainage, electricity, gas and air conditioning;
  • preparation of walls and floors before the finishes;
  • window frames, metalwork and joinery;
  • sanitary equipment;
  • protection of the common areas and final cleaning;
  • materials with a brand or reference, and not just "to be defined".

If a line appears in one proposal and is missing from another, ask why. Whatever is left out comes back later as additional works (trabalhos a mais).

Price is not the only criterion. Also weigh up the proposed execution period, the warranties and insurance stated in writing, experience in similar works and who will be the point of contact during the works. See how to choose the construction company.

Why should you allow a margin for unforeseen costs?

In a renovation, especially in old buildings, situations arise that only become visible when a wall is opened up or a floor is lifted. That is why your planning should include a margin for unforeseen costs, separate from the value of the work.

The appropriate margin depends on the age and condition of the building and on how much is known about it before the works. The more complete the design and the earlier the property is inspected, the lower the risk of surprises tends to be. A good visit and survey of the property reduces doubts before the works begin.

What costs are there besides the works?

The quote for the works is only part of the investment. Before deciding, also add up:

  • the architectural design and, where necessary, the engineering specialties (see the stages of an architectural project);
  • municipal fees, where applicable;
  • equipment, appliances and furniture;
  • connections and any external works;
  • the margin for unforeseen costs;
  • VAT, which may be at the reduced rate for certain works on housing, depending on the case (see reduced VAT).

How to organise the payment schedule?

A good quote comes with a payment plan. The usual practice is for payments to be linked to the progress of the works, by stages or by progress measurements (autos de medição), and not concentrated at the start.

Before signing, confirm what will be paid, when and on what condition. These rules should be set out in the contract. See what to bear in mind in the building contract (contrato de empreitada) and, for the complete process, how a renovation project works.

Frequently asked questions

How many quotes should I request?

Enough to compare proposals made on the same bill of quantities. Three is a good starting point. More proposals only help if they are comparable with one another.

What contingency margin should I allow?

It depends on the building and on what is known about it before the works. In old buildings, a larger margin tends to be justified than in recent properties. A careful survey and a complete design reduce uncertainty.

Can I request quotes without a design?

You can, but you will receive approximations and not quotes. Without a design and without a bill of quantities, each building contractor assumes a different scope, and the price differences say little about the real value.

Should I send photos and plans when requesting a proposal?

Yes. Photos and a floor plan of the property, even if it is not up to date, help to understand what is feasible and to prepare the on-site meeting.

Is a proposal far below the others a sign of a problem?

It is a sign to ask questions. There may be omitted work, different materials or a measurement error. Ask the building contractor to explain, line by line, where the difference lies.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.
Any questions? Talk to us.

Tell us what you need and we will outline the steps, permits and budget to expect.

Request a proposal +