Architecture · Stage 07
As-built drawings for an architectural project.
The drawings updated with what was actually built.

In 30 seconds
- As-built drawings are the seventh and final stage: the drawings updated with what was built.
- They record the works as completed, including the changes made during construction.
- Where the works departed from the approved or notified design, the final drawings may have to be submitted to the municipality (Câmara Municipal), under the applicable regime.
- They remain as the building's record, useful for maintenance, sale and future works.
02 — What it includes
From the design to what was built.
Drag to compare the design drawing with what was built. The differences between the design and the works are marked.
- 01Gather the changesThe changes recorded during the works.
- 02Check on siteAt the final site visit with the Client, what was built is confirmed by on-site observation against the design and the recorded changes.
- 03Update the drawingsPlans, sections and elevations are updated to show the works as completed.
- 04Update the specialist engineering designsBy the respective designers, depending on the works.
- 05Hand overThe final drawings stay with the Client.
As-built drawings reflect the changes that were recorded and checked.
The as-built drawings dossier.
Leaf through the dossier: architecture, structure, water supply and drainage, and electrics, as built.
Example plan; it does not correspond to a real building.
03 — What you receive
Deliverables at this stage.
- Final drawings of the worksPlans, sections and elevations updated with what was built.
- As-built drawings for the specialist engineering designsBy the respective designers, where the works require them.
- Documents for the use of the buildingWhere required by the applicable procedure.
04 — What you decide
The decisions that are yours.
- Confirming the changes made on site and their inclusion in the drawings.
- Which documents the works require for the use of the building, and who handles them.
- Where you keep the final drawings and who receives them, for example the owner or the condominium.
05 — Common mistakes
Common mistakes, and how to avoid them.
How to avoid it. Tell the architect before carrying them out. Some changes require a new procedure before they are carried out and others can be notified later. Always check first.
How to avoid it. Ask for them when the works are completed, while the changes are still visible, and before submitting the documents for the use of the building, where required.
How to avoid it. Keep a copy with the property's documents. They are useful for sales, insurance and future works.
How to avoid it. Carrying out works that do not comply with the design may have consequences, including administrative offences (contraordenações), depending on the case.
Client testimonials
What our Clients say.
Google reviews from our Clients
Client reviews on Google
A selection of published reviews, shown as in the original. See all reviews on Google (4.8 · 47 reviews) ↗
07 — How we work
We think before we build.
This stage closes the process: the final site visit and the drawings of what was built.
- 1. First contactOnline meeting and questionnaire.
- 2. ProposalSent by email, with the scope and the fees by stage.
- 3. Concept design and designSent by email and presented in a meeting.
- 4. Building permitThe applicable procedure is handled by the studio, where required.
- 5. WorksThe Client hires the building contractor directly. The studio provides technical follow-up of the works.
- 6. HandoverFinal site visit with the Client and handover of the keys.
08 — Frequently asked questions
About this stage.
What are as-built drawings and what are they for?
They are the drawings updated with what was actually built. They serve to record the works as completed and, where required by the applicable procedure, to submit them to the municipality.
Are as-built drawings mandatory?
It depends on the procedure and on what changed on site. In principle, they are required when there have been changes to the approved or notified design. We confirm case by case.
Who prepares the as-built drawings?
The studio, for the architecture. Those for the specialist engineering designs are prepared by the respective designers, depending on the works.
Do I need as-built drawings if the works followed the design?
If the works followed the approved design, the as-built drawings may simply confirm the design drawings. We confirm at the end whether there are differences to record; small differences are common.
In what format do I receive the drawings?
As a digital file, duly signed by a qualified professional.
How much do as-built drawings cost and how long do they take?
It depends on the size of the works and the number of changes to record. Contact us for a spacelovers proposal, with the schedule.
Sources and note
- Regime Jurídico da Urbanização e da Edificação (RJUE, Legal Regime for Urbanisation and Building), Decree-Law no. 555/99, of 16 December, as currently in force (use of buildings and changes during the works)
- Decree-Law no. 10/2024, of 8 January (amendments to the RJUE, including the regime for the use of buildings)
This page is for information only and does not replace the analysis of each case, nor does it constitute legal advice. The specific framework that applies to a building project depends on the property, its location, the territorial management instruments and the applicable municipal regulations. The planning regime was amended in 2024 (Decree-Law no. 10/2024, of 8 January); the regime in force is confirmed in each case.
See also: Building permit · Prior communication · Renovation works management