Architecture · Procedure
Pre-application enquiry (PIP).
Updated on 17 November 2026 · Legislation as currently in force
Find out what you can build before you spend on the design.

On this page
- 01What it is
- 0214(1) and 14(2)
- 03Elements of the PIP
- 04Deadlines
- 05Extensions
- 06Rules in force
- 07Changes to the request
- 08Complete PIP
- 09After the PIP
- 10Validity and renewal
- 11Differences
- 12Advantages
- 13Who can apply
- 14If the design changes
- 15When it makes sense
- 16What we do
- 17Documents
- 18Documents by operation
- 19Procedure
- 20Frequently asked questions
- 21Sources
In 30 seconds
- The PIP asks the municipality (Câmara Municipal), before the design, whether an urban development operation is viable and subject to which constraints (Article 14 of the RJUE, the Legal Regime for Urbanisation and Building).
- There are two types: the Article 14(1) enquiry, which is simpler, and the Article 14(2) enquiry, with more elements and stronger effects.
- With an Article 14(2) PIP, when it is favourable and covers all the applicable elements, the works may be exempt from a building permit and from prior communication (comunicação prévia), except for use or change of use (Articles 6(1)(h) and 17(2)).
- Estimated total period, without external consultations: around 45 days (14(1)) and 60 days (14(2)), from 1 October 2026.
The PIP is a formal consultation. The municipality states what the site allows (uses, massing, building heights (cérceas), land cessions (cedências)) before you invest in the specialist engineering designs. It is a way of reducing the risk of a design that later proves unviable.
The PIP is informative in nature: it is for finding out, not for obtaining a licence. The municipality's reply must be read together with what was asked.
Article 14 of the RJUE
Article 14(1) PIP and Article 14(2) PIP
| Aspect | Article 14(1) PIP | Article 14(2) PIP |
|---|---|---|
| Purpose | Viability of the operation and its constraints. | Viability with more complete elements. Applies to all urban development operations, including building works within a subdivision (loteamento). |
| Assessment | 15 days. | 30 days (45 days for subdivision operations). |
| Estimated total period, without consultations | 45 days. | 60 days. |
| Can it make the works exempt? | No. | Yes, when favourable and if it covers all the applicable elements (Articles 6(1)(h) and 17(2)). |
| Documents required | Ordinance (Portaria) no. 320/2026/1. | Ordinance (Portaria) no. 320/2026/1. |
Article 14(2) of the RJUE
What must a PIP for building works show?
A PIP for building works shows the municipality, in the necessary detail, what is intended and where: siting, massing, uses, infrastructure and charges. The more complete it is, the firmer the reply and the less contention there is in the following application.
| Element | What is shown | Where it is checked |
|---|---|---|
| Massing, alignment, building height and siting | How the building, and any boundary walls, fit into the site | Municipal master plan (PDM), detailed plans and regulations |
| Architectural design and descriptive report | The intended solution, with the schedule of uses | Drawings and written documents of the request |
| Schedule of uses | Areas by use, number of dwellings and other units, ancillary and technical areas | Municipal regulations and plan parameters |
| Local infrastructure | The connection to the general infrastructure networks | Municipal services and utility operators |
| Estimate of development charges | Fees and compensation that may be due | Municipal fees regulations |
| Areas to be ceded | Green spaces, community facilities and road infrastructure | Plan and municipal regulations |
To see how an operation is prepared before the request, read about architecture projects and technical due diligence.
Articles 11 and 16 of the RJUE
How long does it take?
Legal estimate without consultations with external bodies. Consultations and extensions lengthen the process.
Preliminary review (saneamento): the municipality checks that the request is properly documented.
Correction (aperfeiçoamento): the period to correct or complete the request.
Assessment and decision: 15 days for 14(1); 30 days for 14(2), which may be extended once, with justification.
Article 16(7) of the RJUE
Can the deadlines be extended?
Only for an Article 14(2) PIP. The municipality may, exceptionally, extend the decision period once only, by the same length: 30 days become 60 and, for subdivision operations, 45 days become 90. The ground is the particular complexity of the operation, namely subdivisions with urbanisation works or operations with a significant impact or an impact similar to a subdivision. The decision lies with the mayor (presidente da Câmara) and must be notified to the applicant by the end of the preliminary review period. There is no extension for an Article 14(1) PIP.
Decree-Law no. 108/2026 (Decree-Law)
Rules in force since 1 October 2026
Deadlines
Preliminary review of 20 days, correction of 10 days and a decision within 15 days (14(1)) or 30 days (14(2); 45 days for subdivision operations), without external consultations.
Tacit approval
If the municipality does not decide within the deadline, the request is deemed tacitly approved (deferimento tácito) (Article 16(6)).
Article 16(5) of the RJUE
What if the PIP is unfavourable or the request has to change?
If the information is unfavourable, the municipality must state the terms on which the operation, if viable, can be revised in a subsequent procedure so as to comply with the applicable planning rules, namely those of the municipal or intermunicipal land-use plan or of the subdivision operation. After an unfavourable decision, the operation is therefore revised in a following procedure.
Before the decision, the municipality may notify the applicant to correct or complete the request within 10 days (Article 11).
Articles 6 and 17 of the RJUE
Does a complete PIP remove the need for a licence?
It does so only if it is an Article 14(2) PIP that is favourable, complete and carried out exactly on the terms assessed. When it covers all the applicable items, the works may start without a licence or prior communication, but the municipality must still be told when the works start and, at the end, the use must be communicated (article 6(1)(h) and article 17(2)). For listed buildings, buildings in the process of being listed, or buildings within a listed group or site, and, in a protection zone, for works the law subjects to a licence, a favourable Article 14(2) PIP does not grant exemption: it leads to the prior communication regime (article 4(4)(l)).
To exempt the works and avoid further consultations, the Article 14(2) request must contain all the items applicable to the operation. If any applicable item is missing, the exemption does not apply: a licence or prior communication follows, as the case may be. Carrying out works that do not comply with the conditions of the pre-application opinion may lead to penalties (article 98).
Article 80-A of the RJUE
After a favourable Article 14(2) PIP
When the works are exempt following the PIP, the notice of the start of works must be accompanied by more documents (Article 80-A(4)):
-
Specialist engineering designsWith the statements of responsibility (termos de responsabilidade) of their authors.
-
Coordinator’s statement of responsibilityFrom the design coordinator.
-
Fees and chargesProof of payment of the fees and other charges due.
-
Land cessionsProof that the cessions have been made, where applicable.
The notice is displayed on site, visible from the public road, up to five working days before the works begin (paragraph 5), and the information lapses if the works do not begin within one year (paragraph 6).
Article 17(5) to (7) of the RJUE
How long is a favourable PIP valid?
Two years, counted from the notification of the favourable decision or from the formation of tacit approval. Within that period, for an Article 14(1) PIP, the building permit application or the prior communication must be submitted; for an Article 14(2) PIP, the urban development operation must be started.
Once the two years have ended, the applicant may ask the mayor, once only, for a declaration that the factual and legal grounds of the favourable decision still apply. The mayor decides within 20 days. If the mayor declares that they still apply, or does not reply within the deadline, the applicant has a further year to submit the building permit application or the prior communication or, for an Article 14(2) PIP that contains all the applicable elements, to start the operation.
Articles 4, 14 and 17 of the RJUE
How does a PIP differ from a building permit and from prior communication?
The PIP asks the municipality whether an operation is viable and on what conditions. It does not grant a title to carry out works. The building permit and prior communication are the procedures that allow the works to be carried out.
| PIP | Building permit | Prior communication | |
|---|---|---|---|
| Purpose | Find out whether it is viable and with what constraints | Obtain a licence before the works | Notify the works and carry them out once the fees are paid and the start has been reported |
| Does it grant a title for the works? | No (except a favourable Article 14(2) PIP, when the works become exempt) | Yes | There is no prior act by the municipality |
| Specialist engineering designs | As a rule, not required at this stage | Submitted with the application or after the architecture | Submitted together with the architecture |
| Effect on the following application | Binds the municipality if the grounds still apply | — | — |
See the pages on the building permit and prior communication.
Articles 15 and 17 of the RJUE
What are the advantages of a PIP?
- Information: it sets out the constraints that apply to the site, such as infrastructure, easements, public-interest restrictions, planning indices, building heights and setbacks. It is useful before buying a plot or a property, to understand what can be done. It is not a valuation.
- Guarantee: the favourable information binds the municipality in the following applications, while it is valid and as long as the intentions presented are maintained (see “How long is a favourable PIP valid?”).
- Simplification: external bodies that have already given their opinion in the PIP do not have to be consulted again, if the design respects the grounds of the PIP. If the terms change, a new consultation may be needed.
Article 14 of the RJUE
Who can request a PIP and how is it submitted?
Anyone with an interest can request a PIP, even without being the owner. The request is made to the municipality where the site is located, with the form and the elements that the municipality requires.
- If the applicant is not the owner, the request identifies the owner and the holders of other rights in rem, with the land registry certificate, because the municipality has to notify them of the procedure.
- The request states the intended operation and the matters on which an opinion is sought.
- The procedure is subject to fees under the municipal regulations; the amount depends on the municipality.
We can prepare the request and follow it through: request a proposal.
Article 17 of the RJUE
What happens if the design changes after a favourable PIP?
The favourable information binds the municipality as long as the design respects the intentions presented in the PIP. If the underlying conditions change, such as massing, use or siting, the following application may not be accepted and the external bodies may have to be consulted again. Before changing the design, it is advisable to confirm the effect of the change with the architect.
Please note
When it makes sense to request a PIP
- Before buying a plot or a property with extension potential
- When there are doubts about building height, massing or planning indices
- When the property is in a protection zone or is subject to constraints
- When a change of use is intended
- In rehabilitation projects with heritage restrictions
- In subdivisions and operations of similar impact
If the works are simple and the planning framework is clear, it may not be worthwhile. We will tell you so at the first meeting.
The studio's role
From the site to the opinion

Constraints and plans

What the site allows

Descriptive report and drawings

From the opinion to the design
Ordinance (Portaria) no. 320/2026/1
What the request includes
-
Application form and standingCode of the permanent land registry certificate and, if necessary, documents proving the applicant’s right.
-
Location and plansLocation plan and extracts from the plans of the applicable territorial plans.
-
Topographic surveyWhere required.
-
Descriptive reportDescribes the operation, the schedule of uses and the area, and shows compliance with the applicable rules.
-
DrawingsDepending on the type of PIP and the operation.
-
Statement of responsibilityFrom the author, with professional qualification and civil liability insurance.
-
External opinionsOr proof of the consultation, if they are not issued within the deadline (Article 15 of the RJUE).
Ordinance (Portaria) no. 320/2026/1
Which documents vary according to the operation?
| Operation | Documents usually requested |
|---|---|
| Building works | Architectural design at the required scale, local infrastructure, land cessions, photographs of the property (for alterations, reconstructions and extensions), estimate of charges, accessibility plan, acoustic study and statements of responsibility |
| Demolition | Description of the state of repair, drawings showing the demolition techniques and the retaining structures, photographs and statements of responsibility |
| Change of use | Plan of the building or unit, demonstration that the use is admissible and that the space is suitable, and statement of responsibility |
| Subdivision and urbanisation works | Larger-scale drawings and specific studies; we analyse each case individually |
The exact list depends on the type of PIP, the municipality and the ministerial order in force.
Comparator
Which procedure applies?
Works expressly exempt from a building permit and from prior communication.
02Prior communicationWhen it is enough to notify the municipality, with the required documents.
03LicenceWorks with a greater impact, with a design and a title for the works.
04Pre-application enquiry (PIP)Find out what you can build before investing.
Frequently asked questions
Frequently asked questions
What is a pre-application enquiry?
It is a request to the municipality about the viability of carrying out an urban development operation and its legal and regulatory constraints, before the design is submitted (Article 14 of the RJUE).
Is a PIP mandatory?
No: it is at the applicant’s option (article 14(1)). It is used to find out, before going ahead with the licensing design, what the municipality will allow. In simple, clear-cut cases it may not be worthwhile (see “When it makes sense to request a PIP”).
What is the difference between an Article 14(1) and an Article 14(2) PIP?
The Article 14(1) PIP asks about the viability of the operation. The Article 14(2) PIP includes more elements and, when favourable, can make the works exempt from a building permit and from prior communication. The deadlines also differ: 15 and 30 days for assessment.
How long does a PIP take?
Without external consultations, around 45 days for 14(1) and 60 days for 14(2), counting the preliminary review (20 days) and, if requested, the correction (10 days). Consultations and extensions lengthen the process.
Does a favourable PIP remove the need for a building permit?
For an Article 14(2) PIP, when favourable and if it covers all the applicable elements, yes: the works can be carried out without a building permit or prior communication, except for use or change of use (Articles 6(1)(h) and 17(2)). Before starting, the municipality must be informed and the documents under Article 80-A(4) must be submitted.
Is the municipality bound by the PIP?
Favourable prior information has the effects set out in Article 17 of the RJUE. Its scope depends on what was requested and on the type of PIP.
What if the municipality does not reply?
Tacit approval applies to the PIP (Article 16(6)). We advise checking the specific case before going ahead.
Do I need an architect for a PIP?
The request includes the statement of responsibility of the qualified author. As a rule, the author of the architectural component is an architect registered with the Ordem dos Arquitectos (the Portuguese Order of Architects).
Does the PIP replace the building permit?
Only for an Article 14(2) PIP, when favourable, and subject to conditions. Otherwise, it is a preliminary stage: the building permit or prior communication follows.
When is a PIP not worthwhile?
When the works are simple, the planning framework is clear and the planning risk is low. We assess this with you before submitting a request.
Can I request a PIP without being the owner?
Yes. Anyone with an interest can apply, as long as the request identifies the owner and the holders of other rights in rem over the property (Article 14 of the RJUE).
What happens if I change the design after a favourable PIP?
Whether the municipality remains bound depends on the grounds of the PIP still applying. Significant changes may mean the following application is not accepted. Check the change with the architect before submitting.
Can a PIP be used to assess a plot before buying it?
It gives planning indicators for the site, such as building heights, indices and constraints, which help in making a decision. It is not a valuation of the plot.
Legal sources
Sources
- RJUE (Decree-Law no. 555/99, as currently in force), Articles 6, 14 to 17 and 80-A
- Decree-Law no. 108/2026, of 29 May
- Decree-Law no. 155-B/2026, of 31 July (in force from 1 October 2026)
- Ordinance (Portaria) no. 320/2026/1, of 31 July
Last legal review: November 2026. Legislation consulted on 10 November 2026, as currently in force.
This page is for information only; it does not replace the analysis of each case, nor does it constitute legal advice. How a particular project is framed depends on the property, its location, the territorial management instruments and the applicable municipal regulations.
How we work
We think before we build
Online meeting and questionnaire.
Sent by email, with the scope and the fees by stage.
Delivered by email and presented at a meeting.
Handled entirely by us.
Fortnightly or weekly follow-up, with reports.
Final visit with the Client.
Client testimonials
What our Clients say.
Google reviews
Client reviews on Google
A selection of published reviews, shown as in the original. See all reviews on Google (4.8 · 47 reviews) ↗
Request a proposal
