Rehabilitation and funding

Declaration of ruin: what it is, how to obtain it and what to do next

The declaration of ruin (declaração de ruína) is the document that proves that a building is in ruins, that is, that the deterioration of its envelope impairs the use for which it is intended. It may be issued by the municipal council (Câmara Municipal) or by the Directorate-General for the Treasury and Finance (Direção-Geral do Tesouro e Finanças, DGTF), within the scope of their powers, and, solely for energy certification purposes, by a qualified expert of the Energy Certification System for Buildings (Sistema de Certificação Energética dos Edifícios, SCE). Buildings in ruins are excluded from the obligation to have an energy performance certificate.

By Sofia Silva28 April 202615 min read

Declaration of ruin: what it is, how to obtain it and what to do next

In short

  • "Building in ruins" has a legal definition in the energy certification regime (Decree-Law No. 101-D/2020): what counts is the condition of the envelope, not the appearance.
  • Proof is provided by a declaration from the municipal council or the DGTF or, solely for energy certification, by a provisional declaration issued by a qualified SCE expert.
  • Buildings in ruins do not need an energy performance certificate.
  • For municipal property tax (Imposto Municipal sobre Imóveis, IMI) purposes, properties in ruins may be subject to an increased rate; identification is the responsibility of the municipality, which notifies the Tax and Customs Authority (Autoridade Tributária e Aduaneira, AT).
  • Reconstruction based on the last valid precedent is, as a rule, exempt from the building permit (licença) and from prior communication (comunicação prévia); the protection of existing buildings (garantia do existente) safeguards what was lawfully built.
  • Demolition that is not part of a reconstruction is, as a rule, subject to a building permit.

What, legally, is a building in ruins?

"It's in ruins" is an everyday expression, but it has a legal definition. Decree-Law No. 101-D/2020 of 7 December, which governs the Energy Certification System for Buildings (SCE), defines a building in ruins as an existing building whose level of deterioration of its envelope impairs the use for which it is intended, as proven by a declaration from the municipal council or the DGTF or, solely within the scope of energy certification, by a provisional SCE declaration issued by a qualified expert (Article 3(g)).

The decisive word is envelope: the set of elements that separate the usable interior space from the exterior, the ground and other buildings (Article 3(m)). In practice, this includes the external walls, the roof, the floors in contact with the exterior or the ground, and the openings (doors and windows).

A property may have been run-down or abandoned for years without being in ruins in the legal sense. And a more recent property may have its roof or walls so compromised that this classification is justified. The assessment is technical, not visual.

What is the declaration of ruin and how does it differ from the energy performance certificate?

The declaration proves that the building is in ruins. As a result, the building is excluded from the obligation to have an energy performance certificate (Article 18(2)(g) of Decree-Law No. 101-D/2020).

Energy performance certificateDeclaration of ruin
PurposeRates the energy performanceProves the state of ruin
Improvement recommendationsIncludedNot included
When it is usedUsable buildingBuilding in ruins

What is the declaration of ruin for?

  • Energy certification: it proves that the building is outside the certificate obligation, for example in a sale or a lease.
  • Planning procedures: it documents the condition of the building before a reconstruction or demolition.
  • Tax matters: it helps clarify the condition of the property, although identification for IMI purposes is carried out by the municipality (see below).

The documents required for a deed or a contract depend on the case: confirm with the notary or a lawyer which documents are required for a property in ruins.

How do you obtain the declaration of ruin?

  1. Choose a qualified SCE expert, registered in the system managed by ADENE (the Portuguese energy agency), if the declaration is solely for energy certification purposes.
  2. Visit to the property. The expert assesses the envelope and records the evidence: photographs, technical description and grounds.
  3. Issue. The expert issues the provisional declaration in the SCE system.

Who can issue the declaration?

  • Qualified SCE expert. Issues the provisional SCE declaration, valid solely within the scope of energy certification.
  • Municipal council. Within the scope of its powers. It may be relevant in planning procedures and in identifying properties in ruins for IMI purposes.
  • Directorate-General for the Treasury and Finance (DGTF). Within the scope of its powers.

Which documents are needed to sell a property in ruins?

The sale follows the normal process of any transaction. As a rule, for the deed:

  • an up-to-date land registry certificate (certidão do registo predial);
  • an up-to-date property tax record (caderneta predial);
  • a document proving the state of ruin, if the energy performance certificate is not presented for that reason;
  • a reference to the property's planning permit, or a declaration that it exists or that it does not exist, failing which the deed is voidable (Article 4-A(14) of Decree-Law No. 555/99, as currently in force);
  • proof of payment of the taxes due on the transfer;
  • identity documents of the parties to the deed.

What should you check before buying?

  • Whether there is a declaration of ruin and who issued it.
  • Any IMI owed and whether the property has been identified by the municipality as being in ruins, which may increase the IMI.
  • Whether the property is in an area of urban pressure (zona de pressão urbanística), where the increase is greater.
  • The date of the original construction and the documents that prove the last valid precedent (see buildings constructed before 1951).
  • The property tax record: old properties may have incorrect areas or uses recorded.

What are the tax consequences of a ruin?

How much is the IMI increase?

SituationIncreaseBasis
Urban property in ruins, where its state of repair is not the result of a natural disaster or calamityRate tripledIMI Code, Article 112(3)
Property in ruins in an area of urban pressureRate increased sixfold, with a further increase in each subsequent year, up to the limit set by lawIMI Code, Article 112-B

Areas of urban pressure are delimited under specific legislation. The municipal assembly (assembleia municipal) may also raise the limit of the increase in certain cases.

Who does what?

  • Municipalities identify properties in ruins and notify the AT of that identification electronically (Article 112(16) of the IMI Code).
  • The identification is also published on the municipality's website and in the municipal bulletin, where one exists.

Having a provisional SCE declaration is not the same as the property being identified by the municipality for IMI purposes: they are separate processes. If in doubt about IMI, consult an accountant or a lawyer.

Can I reconstruct a building in ruins?

As a rule, yes, if it can be shown what lawfully existed. Two RJUE rules count.

What does Article 60 of the RJUE say?

Buildings constructed under the previous law, and their uses, are not affected by subsequent legal and regulatory rules (Article 60(1)). Reconstruction or alteration works cannot be refused on the basis of rules that postdate the original construction, provided that they do not create or worsen non-compliance with the rules in force, or that they result in an improvement in the safety and health conditions of the building (paragraph 2). The law may nevertheless require ancillary works to improve safety and health conditions (paragraph 4).

In practice, if a building was lawfully constructed and fell into ruin, reconstruction cannot be refused simply because current rules are more demanding. These conditions must be demonstrated in the architecture project.

Do I need a building permit to reconstruct?

Since 1 October 2026, with Decree-Law No. 108/2026, reconstruction works have been exempt from the building permit and from prior communication (Article 6(1)(e) of the Legal Framework for Urbanisation and Building (Regime Jurídico da Urbanização e da Edificação, RJUE)). Reconstruction is work carried out after the total or partial demolition of an existing building, based on its last valid precedent, reconstituting the composition of the facades and the roof (Article 2(c)). The last valid precedent is the last valid and effective urban development operation or the one that, at the time, did not require a permit (Article 2(r)).

There are limits:

  • if the works increase the footprint, the gross floor area, the facade height or the volume, they constitute an extension and follow the applicable procedure;
  • for listed buildings or buildings in the process of being listed, reconstruction remains subject to a building permit, as do certain works in protection zones (Article 4(2)(d));
  • the exemption does not waive compliance with the applicable rules, such as municipal plans, the National Ecological Reserve (Reserva Ecológica Nacional, REN), the National Agricultural Reserve (Reserva Agrícola Nacional, RAN) and heritage protection (Article 6(8)).

Useful evidence of the last valid precedent includes the deed, the land registry certificate, a property tax record with an old registration, old plans and photographs, and certificates from the municipal council.

And if only the foundations remain?

If little or nothing of the building remains, the question is whether there is still an "existing building" to reconstruct. The answer depends on the municipal council's analysis of each case. To improve the chances, it is essential to show with documents that the building existed, that it was lawfully constructed and what its configuration was.

To decide between reconstructing and rehabilitating, see the article on rebuilding or rehabilitating an old house and the page on urban rehabilitation. See also our building rehabilitation service.

What about demolition? Who can order it?

Demolition ordered by the municipal council

The municipal council may order the total or partial demolition of buildings that are at risk of collapse or that pose a danger to public health and to people's safety (Article 89(3) of the RJUE). It may do so on its own initiative or at the request of any interested party.

The decision is preceded by an inspection by technicians appointed by the municipal council (Article 90(1)). In the event of an imminent risk of collapse or serious danger to public health, these formalities may be waived (Article 90(8)).

Demolition at the owner's initiative

As a rule, the demolition of a building that is not part of a reconstruction is subject to a municipal building permit (Article 4(2)(f)); in areas covered by a detailed plan (plano de pormenor), implementation unit (unidade de execução) or plot subdivision (loteamento) with defined parameters, a prior communication may be enough (Article 4(4)(d)). Carrying out urban development operations without the required permit is an administrative offence punishable by a fine (Article 98). An evident state of ruin does not, in itself, waive the legal framework. See the article on the demolition project and the page on the building permit procedure (licenciamento).

And after the works?

After a rehabilitation or reconstruction that ends the state of ruin, the building returns to the general rules: the energy performance certificate becomes required in the cases provided for by law, for example on sale or lease, and the property tax record and the land registry must be updated. See the article on how to update the documents after legalisation.

spacelovers is an architecture studio that designs, obtains permits and provides technical assistance during construction. For a ruin, we analyse the regulatory framework and prepare the reconstruction or rehabilitation project; decisions and contracts belong to the Client.

Frequently asked questions

My house has a roof but the walls are compromised. Can it be considered in ruins?

It can. Having a roof does not rule out this classification: what counts is whether the deterioration of the envelope, as a whole, impairs the use for which the building is intended.

Can I sell without a declaration of ruin if the buyer accepts the situation?

The exclusion from the energy performance certificate depends on the building actually being in ruins. Confirm with the notary or a lawyer which documents are required for the deed of a property in ruins.

I have a property in ruins from 1920. Can I reconstruct it without a building permit?

With the RJUE in force since 1 October 2026, reconstruction works are, as a rule, exempt from the building permit and from prior communication, provided that they are limited to restoring the building based on the last valid precedent, without increasing the floor area, height or volume. This is not the case for listed buildings or buildings in the process of being listed. Confirm with the municipal council and with a qualified professional whether other bodies need to be consulted, for example because of the REN, the RAN or heritage.

Does the increased IMI apply just because I have a declaration from the expert?

No. For IMI purposes, it is the municipality that identifies properties in ruins and notifies the AT of that identification. The provisional SCE declaration serves only for energy certification.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Photo: spacelovers.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.