It depends on the case and the municipality, and it is rarely unrestricted. Under the General Regulation on Urban Buildings (Regulamento Geral das Edificações Urbanas, RGEU), the lasting occupation of a yard (logradouro) or courtyard with structures, such as lean-to roofs or canopies, depends on the express authorisation of the municipal council (Câmara Municipal). If the space is a common part of the building, the works may also need approval at the condominium owners' meeting (assembleia de condóminos). Sealing the whole area runs counter to the drainage rules.

By Sofia Silva22 April 202612 min read

Yards and courtyards in condominiums: what you can build

In short

  • A yard is not "leftover land": it provides the building with light, ventilation, sunlight and drainage.
  • Under Article 74 of the RGEU, the lasting occupation of yards with structures depends on the express authorisation of the municipal council.
  • In a yard that is a common part, works that alter the architectural line or the aesthetic arrangement of the building need the approval of the condominium owners' meeting.
  • Article 76 of the RGEU requires an impermeable strip at least 1 metre wide along the building and the rest landscaped or suitably laid out.
  • Some works of minor urban significance are exempt from a building permit, within the limits of the law and the municipal regulation.

Why is a yard not just unused space?

It is one of the most common misconceptions in urban rehabilitation: thinking that the yard or courtyard of a building is an empty space where you can build as long as there is room.

It is not. These spaces ensure natural lighting of the rooms, ventilation, sunlight on the rear façades, rainwater drainage and the hygrothermal balance of the walls.

When they are gradually taken over by extensions, roofs, storage and impermeable paving, these functions deteriorate. The impact is felt in health and hygiene conditions, in damp walls and in the legal status of the property. If you are considering a broader intervention, see our building rehabilitation service and the article on rehabilitating an old building.

What do the RGEU and the RJUE say about yards?

The RGEU was approved by Decree-Law No. 38 382 of 7 August 1951. It has been declared repealed, but the repeal only takes effect when the future legislation with the new technical building rules comes into force; until then, the provisions that have not been repealed continue to apply. Three articles are central to this topic.

What minimum dimensions must a yard have? (Article 62)

For multi-family or collective residential buildings, Article 62 provides that each building must have its own yard, across the full width of the plot and with easy access from outside, unless there is a shared yard ensuring the same conditions. That yard must have:

  • a depth of no less than half the height of the adjacent façade, with a minimum of 6 metres;
  • a free, uncovered area of no less than 40 m².

In corner buildings, these requirements may be waived if lighting, ventilation and sunlight are ensured. An intervention that reduces the yard below these values makes the building non-compliant, which matters above all in rehabilitation works.

Can I put up a lean-to roof or an outbuilding? (Article 74)

Article 74 deals with the lasting occupation of yards, courtyards or recesses with structures, such as lean-to roofs and canopies, and with cluttering them with materials or volumes. Such occupation may only take place with the express authorisation of the municipal council, and provided it does not harm the appearance, health and hygiene conditions and safety of the buildings.

In practice: a permanent structure, from a metal lean-to roof to a masonry outbuilding, should not go ahead without the municipal council having given its opinion. The specific procedure (building permit (licença), prior communication (comunicação prévia) or exemption) depends on the works and on the municipal regulation.

What rules apply to walls and drainage? (Article 76)

Article 76 adds two requirements:

  • along the building, a strip at least 1 metre wide finished in an impermeable material, or another equally effective solution against water infiltration;
  • the remaining area landscaped or otherwise suitably laid out, and the paving sloped to ensure rapid drainage of water to a drain with a water seal.

The article does not prohibit paved areas. It requires drainage to be ensured and the rest of the space to be suitably laid out.

In a condominium, who decides what is done in the yard?

There are two different situations, which should be kept separate.

The courtyard is a common part with exclusive use

This is the most frequent situation. The yard is a common part of the building, but the deed establishing the horizontal property regime (título constitutivo da propriedade horizontal) grants its exclusive use to one unit (fração).

In these cases, the Civil Code (Código Civil) requires authorisation from the condominium owners' meeting, by a majority representing two thirds of the total value of the building, for works that alter the architectural line or the aesthetic arrangement of the building (Article 1422(3)). Installing a lean-to roof, building an outbuilding or paving the courtyard may therefore require:

  • approval at the condominium owners' meeting;
  • authorisation from the municipal council (Article 74 of the RGEU);
  • the applicable planning procedure, such as prior communication or a building permit.

A frequent mistake: confusing exclusive use with ownership. Going ahead without the owners' meeting can lead to conflicts with neighbours and to litigation. Check with the condominium administrator or with a lawyer what the deed establishing the horizontal property regime provides.

The courtyard is an integral part of the unit

If the deed establishing the horizontal property regime describes the yard as an integral part of the unit, the owner has more room to decide within the condominium. The planning rules, however, still apply: the limits on occupation and on health and hygiene conditions apply to any yard.

Can I pave the whole yard?

It is not advisable, from either a technical or a legal point of view. Covering the yard with concrete, stone setts or another impermeable material has consequences:

  • Damp in the walls. An impermeable surface next to the façade, without suitable drainage, makes it harder for the ground to dry out; damp rises through the walls and causes stains, efflorescence and deterioration of the finishes.
  • Overloading the drainage. Water that the ground does not absorb goes into the network. In heavy downpours, this contributes to flooding and backflow.
  • Non-compliance. Article 76 requires drainage and a suitable layout; sealing the whole area without meeting these requirements may make future licensing or legalisation more difficult.

What alternatives are there?

  • A 1-metre impermeable strip along the façade, sloping to a trapped drain connected to the building's network.
  • Permeable or semi-permeable areas over the rest of the space: gravel, open-jointed stone setts, timber decking on a draining base, or planting.
  • Permeable paving in circulation areas, such as the access to the door or the seating area.
  • Planting, which helps regulate temperature and manage rainwater.

What can and cannot be done in the yard?

A summary of the situations as they result from the rules above. In all of them, check the municipal master plan (Plano Diretor Municipal, PDM) and the municipal regulation of your municipality.

  • Lean-to roof or fixed canopy: conditional. Authorisation from the municipal council and, if it is a common part, from the owners' meeting.
  • Masonry storage outbuilding: conditional. Authorisation from the municipal council, the applicable planning procedure and, if it is a common part, approval from the owners' meeting.
  • Sealing the whole area: not advisable; it runs counter to the drainage requirements of Article 76.
  • 1-metre impermeable strip along the façade: required by Article 76, with a slope and a drain.
  • Permeable paving or open-jointed stone setts: in principle acceptable, provided drainage is maintained and the minimum areas of Article 62 are not reduced. Check with the municipality.
  • Planting or timber decking: as a rule these are light interventions, but whether prior control is needed depends on the size, the municipality and the applicable regulations. Check before going ahead.
  • Works that reduce the depth below 6 metres or the free area below 40 m²: in principle not acceptable, as they run counter to Article 62.

Which works may be exempt from a building permit?

The Legal Framework for Urbanisation and Building (Regime Jurídico da Urbanização e da Edificação, RJUE) (Decree-Law No. 555/99, as currently in force) provides for works of minor urban significance (obras de escassa relevância urbanística), exempt from a building permit and from prior communication within certain limits, and municipal regulations set them out in detail. In Lisbon, this is the Municipal Regulation on Urbanisation and Building (Regulamento Municipal de Urbanização e Edificação de Lisboa, RMUEL). Always check the limits in the version in force of your municipality's regulation.

Even when exempt, the works:

  • must comply with the municipal plans, easements (servidões) and technical standards, and may be inspected;
  • may have to be notified to the municipal council before work starts (see notice of works and notification of the start of works);
  • may not benefit from the exemption in classified areas or areas subject to easements.

To understand which works do not require a procedure, see works exempt from prior control (obras isentas de controlo prévio) and consult the PDM for the required permeability ratios.

What should you check before going ahead?

  • The legal nature of the space: a common part with exclusive use or an integral part of the unit.
  • Whether the intervention meets the minimums of Article 62 of the RGEU.
  • The municipal urbanisation and building regulation of the municipality and the PDM.
  • In a condominium, approval from the owners' meeting before starting the process with the municipal council.
  • A qualified professional to frame the operation and prepare the application. If there are doubts about feasibility, a prior information request (pedido de informação prévia) lets you clarify them before investing.

A good intervention in a yard is not the one that takes up the most space: it is the one that balances use, drainage, light and legality. For the framework of the procedures, see licensing.

Frequently asked questions

My deed gives me exclusive use of the courtyard. Can I carry out works without going through the owners' meeting?

It depends. If the courtyard is a common part with exclusive use, works that alter the architectural line or the aesthetic arrangement of the building need the approval of the owners' meeting. If the deed establishing the horizontal property regime describes it as an integral part of your unit, you have more autonomy, but the planning rules still apply.

My ground-floor neighbour has sealed the whole yard without authorisation. What can I do?

If the yard is a common part, you can take the matter to the condominium owners' meeting. You can also file a complaint with the municipal council, which can inspect and order measures to restore legality (reposição da legalidade), including, in certain cases, demolition. If the works are under way, see the article on stop-work orders for private works (embargo de obra particular).

Do I need a building permit for an aluminium and polycarbonate lean-to roof?

Article 74 of the RGEU makes the lasting occupation of the yard, including lean-to roofs in lightweight materials, subject to the express authorisation of the municipal council. The specific procedure depends on the works and on the municipal regulation: check with the municipal council before buying the materials.

Can I install a removable pool in the yard?

A removable pool with no fixed infrastructure may not constitute works subject to prior control, but the answer depends on the case and the municipality. Also check the deed establishing the horizontal property regime and the condominium regulations, and make sure the water drains properly.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Photo: spacelovers.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.
Any questions? Talk to us.

Tell us what you need and we will outline the steps, permits and budget to expect.

Request a proposal +