Rehabilitation and funding

Restoring an old house: from diagnosis to works, step by step

Restoring an old house is done in stages: diagnosis of the building, assessment of its structural safety, the architecture and engineering specialty projects, the procedure with the municipal council (Câmara Municipal) and, only then, the works. Each stage determines the next, so it is best not to skip any of them. The cost depends on the condition of the building and on what you want: for a first order of magnitude, use the renovation cost simulator.

By Sofia Silva8 February 20257 min read

Restoring an old house: from diagnosis to works, step by step

In short

  • First comes the diagnosis: defects, structure, damp and elements to preserve.
  • The seismic vulnerability assessment shows whether the building needs structural strengthening and to what extent.
  • The design brings together architecture, structure and engineering specialties, coordinated within a single design team.
  • Before the works, the rules for the site and the applicable procedure with the municipal council are confirmed.
  • During the works, the Client hires the building contractor directly; spacelovers provides technical assistance on the Client's behalf.

Why restore an old house?

An old house has elements that are hard to reproduce: stonework, hand-painted tiles (azulejos), ornate ceilings, solid wood floors. Restoration preserves that identity and brings comfort up to date.

The original construction is not always good from a structural or waterproofing point of view. That is why the design team analyses the building carefully and defines the balance between what is preserved and the comfort the house will offer.

If you are still deciding whether to buy or to rebuild, see is it worth buying an old house to restore and rebuild or rehabilitate an old house.

How is an old house diagnosed?

It is the first step and must be rigorous. Cracks and fissures, damp, deterioration of structural elements, constructive incompatibilities and additions from later periods are identified. The architectural elements and their state of conservation are characterised.

The diagnosis is carried out by an architect and an engineer, who may use tests and material analysis to define the approach. It starts from a good on-site survey. If you have not bought yet, a technical and planning analysis before the deed of sale (escritura), as part of our architecture projects, helps you decide with full information.

Do I need a seismic vulnerability study?

Structural safety is decisive in an old house. The seismic vulnerability assessment report analyses the building's capacity to withstand an earthquake and indicates whether strengthening is needed.

Strengthening must use techniques and materials compatible with the original construction. To find out when the report is required and what it contains, read the article on the seismic vulnerability assessment study.

What does the rehabilitation design include?

Once the diagnosis is done and the brief is defined, feasibility is assessed and the projects are developed. An accurate survey often reveals differences from the property cadastre (cadastro predial), which will have to be corrected.

The design covers:

  • Architecture: construction solutions, layout of the spaces and relationship with the existing building.
  • Structure: seismic vulnerability assessment, where applicable, and the structural project (projeto de estabilidade) with the necessary strengthening.
  • Engineering specialties: water supply and drainage networks, electricity, thermal performance, acoustics, ventilation and any others the case requires. See engineering specialty projects.

Coordination between architecture and the engineering specialties, led by a professional with experience in rehabilitation, ensures that the intervention respects the building and complies with the technical regulations.

What rules and procedures apply?

Depending on the location, the municipal plan may set rules on facades, materials, volume, floor area and soil permeability. Before any works, confirm with the municipal council what applies to the property and which opinions from other bodies are required.

Depending on the type of works, the procedure may be a building permit (licença) or a prior communication (comunicação prévia), and some works are exempt from prior control (isentas de controlo prévio). A prior information request (pedido de informação prévia) lets you test feasibility before the design.

Does the house have to comply with current standards?

For the part that already exists, as a rule, no. The Legal Framework for Urbanisation and Building (Regime Jurídico da Urbanização e da Edificação, RJUE) (Decree-Law No. 555/99, as currently in force) protects buildings constructed under the previous law: they are not affected by later standards. Alteration or reconstruction works cannot be refused solely on the basis of those standards, provided they do not create or worsen non-conformities, or provided they improve the safety and health conditions of the building (Article 60). The law may nevertheless require the works to include work that improves safety and health conditions.

The protection covers what exists, not what is added. In an extension, such as a new storey or a new volume, the new part complies with the standards in force.

Changing the use, for example from a shop to a home, has its own procedure with the municipal council, even without works: see converting a shop into a home. If the house has parts built without a permit, read legalisation of existing buildings.

What improvements are made to the house?

Well-considered interventions modernise the house without erasing the identity of the building:

  • Thermal and acoustic insulation, with solutions compatible with the existing walls and floors.
  • Infrastructure: renewal of the electrical, water supply and drainage installations.
  • Natural light: skylights and new openings, where the building and the plan allow it.
  • Facades: cleaning and restoration of stone, wood, wrought iron or tiles.
  • Old structures: strengthening of timber beams and of rammed-earth (taipa) or timber-frame partition (tabique) walls, with compatible materials.
  • Outdoor spaces: courtyards and terraces that bring light and cross-ventilation.
  • Energy efficiency: efficient window frames, natural ventilation and insulation of the building envelope.

What support and VAT rates are available?

There are tax regimes that may reduce VAT on rehabilitation works, for example in buildings located in an Urban Rehabilitation Area (Área de Reabilitação Urbana, ARU) or on renovation works on housing. The conditions depend on the property, the type of works and the law in force: see the article on reduced VAT on works and the framework in urban rehabilitation. Find out more about our building rehabilitation service.

And during the works?

After the design and the procedure with the municipal council, the Client hires the building contractor directly. spacelovers is an architecture studio: it designs, handles the permitting and provides technical assistance during construction. Decisions and contracts belong to the Client. See how we support the selection of the building contractor and technical assistance during construction.

In what order are the works carried out?

In an old house, the order of the works matters. First comes what ensures safety and weathertightness; only then the finishes.

  1. Structure. Strengthening and correction of the serious problems identified in the diagnosis.
  2. Roof and envelope. Roof, facades and window frames, to protect the house from water and cold.
  3. Installations. Electricity, water, drainage and, where necessary, heating and ventilation.
  4. Thermal comfort. Insulation and energy efficiency solutions compatible with the building.
  5. Finishes. Floors, wall and floor coverings, kitchen, bathrooms and painting.

The specific sequence is defined in the design and in the building contractor's work schedule. Mistakes to avoid: starting the works without confirming the applicable procedure, underestimating the structural constraints, choosing materials incompatible with the original construction and failing to coordinate the engineering specialties.

What are the advantages and the difficulties?

Advantages

  • Preserves the built heritage and the original architecture.
  • Reuses existing materials and reduces waste.
  • Improves comfort and energy performance.
  • Adapts the spaces to today's way of life.

Difficulties

  • Some buildings have damage that requires extensive structural strengthening or even a new structure.
  • The works call for specialised labour and solutions tailored to the building.
  • Specific opinions may have to be obtained, depending on the location and the condition of the property.
  • Integrating new electricity, water, heating and telecommunications networks into an old building is complex.
  • What is only discovered during the works may require solutions to be revised, especially in buildings of heritage value.

Frequently asked questions

Where should I start?

With the diagnosis of the building, carried out by an architect and an engineer. Only then can you tell whether restoration is worthwhile, what strengthening is needed and what design to develop.

Does the structure always need strengthening?

No. It depends on the conclusions of the diagnosis and the seismic vulnerability assessment. In some cases the strengthening is localised; in others, the structure has to be rebuilt.

Is restoring better value than demolishing and building?

It depends on the building and on what you want. The article rebuild or rehabilitate an old house compares the two options.

Can I live in the house during the restoration?

It depends on the scale of the intervention. Works on the structure, the roof and the installations usually make the house uninhabitable for part of the process. Plan the stages with the architect and the building contractor before you start.

Is there a special regime for a house that is several decades old?

There may be. The Legal Framework for Urban Rehabilitation (Regime Jurídico da Reabilitação Urbana) (Decree-Law No. 307/2009, as currently in force) provides for a special regime for buildings or units legally constructed at least 30 years ago, inside or outside an Urban Rehabilitation Area, that need works due to deterioration or inadequacy. Among other conditions, the works must preserve the main facades and the elements of heritage value and must not reduce structural resistance, and they follow a simplified prior control procedure (Articles 77-A and 77-B). It does not apply to listed properties or properties in the process of being listed. Confirm with the municipal council whether your case qualifies.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Photo: spacelovers.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.