House designs: how to choose and what to expect

A house design only works when it grows out of the land, the budget and the way the family lives. Standard designs take care of the look, but rarely of the permitting. Understanding the options, what shapes the design and how the stages are organised avoids surprises before and during construction.

By Sofia Silva22 December 20198 min read

House designs: how to choose and what to expect

In short

  • A house design can be a standard design, an adapted design or a made-to-measure design; only the last starts from your land and your brief.
  • The municipal master plan (Plano Diretor Municipal, PDM), the orientation and the topography of the plot define what you can build, before any drawing.
  • Besides the architecture, several engineering specialties are needed, coordinated from the outset.
  • The design is divided into stages, from the concept design to the detail design; 3D helps you decide early, but does not replace the technical drawings.
  • A new house requires, as a rule, a building permit (licença) or a prior communication (comunicação prévia) to the municipal council (Câmara Municipal).
  • The construction works are contracted directly by you with the building contractor; the studio follows the link between design and execution.

Standard, adapted or made-to-measure design?

Standard design. A ready-made design, conceived for a generic plot. It can serve as inspiration, but it is only viable if it complies with the PDM and with the constraints of your plot. It usually requires adaptation and a new permitting process.

Adapted design. Starts from an existing base and adjusts it to the land and to the brief. It sits halfway in terms of freedom and of adaptation work.

Made-to-measure design. Grows out of your land, your budget and the family's way of life. This is where the brief has the greatest advantage: it defines how many spaces you need, how large they are and where they go, before construction begins. In a house that has already been built, you do not choose where the bedrooms or the kitchen go.

Looking for a specific architectural language? See modern houses or the single-level layout of single-storey houses.

What is the investment and what is the house for?

The starting point is the overall investment. It is linked to the purpose: designing to live in is very different from designing to sell and, in the latter case, it is worth understanding who the house is aimed at.

The funds available have to cover more than the construction works: land, fees and taxes, designers, building contractor, external works and, where applicable, interior decoration and property marketing. Only with this sum, and a contingency reserve, do you have an idea of the overall cost of the house. To understand the cost structure, see the complete guide to building a house and the construction cost estimate.

What shapes the design: PDM, orientation and topography?

The location is the heart of the design, and it is linked to what you want to build. The clearest way to choose the place is to start from the spaces that make up your brief.

The PDM may constrain the viability and the gross floor area. Questions to ask before buying:

  • Does the land allow building? With what gross floor area?
  • Which constraints and regulations will the design have to comply with?
  • Do the solar orientation and the topography favour or complicate the brief?

You can obtain information from the municipality on whether it is possible to build on a plot and on the applicable constraints; this right to information is free of charge. An initial analysis by someone who designs houses helps you make the most of the land and detect problems with the plot before the first sketch. Before the purchase, see also how to buy land.

Who is part of the design team?

The architect is the professional with the cross-cutting view needed to design the house, and it is best to choose one right at the start, ideally before closing the purchase of the land. But the house depends on other engineering specialties: structural engineering, water supply and drainage, electrical and telecommunications infrastructure in buildings (ITED), gas, accessibility and external works, among others.

The engineering disciplines should work together with the architecture, in an integrated design. This coordination weighs heavily on the success of the works. For the legal framework and the designs required, see single-family house permitting and building permit designs.

How is the house's brief defined?

The brief (programa) is the set of space requirements and their dimensions: it ensures there is enough, with no shortfalls or excesses. Today's way of living values functionality and practicality; a good house does not have to be huge.

The interior spaces are the core that the building envelope protects. For budget reasons, these, together with the external works, are often the ones that suffer cuts: by the time their turn comes, the budget has already been consumed by the structure and the envelope. So plan early for:

  • in the bedrooms, built-in wardrobes and lighting;
  • in the living area, the setting for a fireplace or wood-burning stove, if you want one;
  • in the kitchen, a functional layout and quality joinery, so you do not have to replace the units early.

Materials also deserve time. Visit showrooms or ask for samples, because in real life they rarely look like the photograph. Save where you can without putting quality at risk.

Which construction system should I choose?

The structure is responsible for stability and should be defined early. The designers may propose, for example, reinforced concrete column-and-beam frames, a timber, steel or hybrid structure, or light steel framing (LSF). Each option affects the dimensions and has a different impact on the architectural design.

The external walls and the roof, the envelope, should also be considered early, to ensure the thicknesses needed for insulation and thermal comfort. If you want everything on one level, which can simplify the structure, see single-storey houses. For an overview of construction, the article on building houses goes into the subject in more depth.

What are the stages of a house design?

The design progresses in stages, from gathering information to the construction drawings. Broadly speaking:

  1. Topographic survey and site analysis, so that the first sketches start from the real land. Where necessary, geotechnical characterisation of the soil informs the foundations and the structure.
  2. Concept design (estudo prévio), with the initial proposal for siting, volumes and spaces. This is the stage to ask whether the house makes the most of natural light and views, whether the rooms connect as you need them to in daily life, whether there is enough storage and whether the design can adapt in the future.
  3. Permit design (projeto de licenciamento), with the necessary engineering specialties.
  4. Detail design (projeto de execução), with the detail the building contractor needs to build and price the works.

For the complete sequence, see the stages of an architectural project and the architecture projects page.

What does a 3D house design show?

A 3D model translates plans, sections and elevations into an image anyone can understand, almost like a digital scale model. Used at the concept design stage, it helps you decide early on the siting on the land and the relationship with neighbouring buildings, the way light falls and the solar shading of each façade (in line with bioclimatic architecture), the materials and the colours. It also shows junctions between volumes, roofs and façades that go unnoticed in 2D drawings. Correcting things at this stage is simpler than on site.

There are several formats:

  • Navigable 3D model: to see the volume and the spaces from various angles.
  • Realistic images: with light, colours and textures, for interiors and exteriors.
  • Video and virtual reality: walkthroughs of the house, for a more immersive sense of it.

What each proposal includes varies: ask the studio at what stage 3D comes in and which images or videos are included.

3D is a tool for decision-making and communication. It does not replace the dimensioned technical drawings, the detail design or the engineering specialties, and it does not do away with the thermal calculations. Use the images to discuss and decide, not as a promise of the finish.

Which permits and procedures are needed?

The procedure depends on the type of works: some works are exempt from prior control, but building a new house requires, as a rule, a building permit or a prior communication to the municipal council, under Decree-Law No. 555/99, as currently in force. The architect identifies the procedure that applies to your case and prepares the documents for the permit design, with the necessary engineering specialties. Works carried out without the proper procedure may have to be regularised later: before building, always confirm what applies. See also building permits.

What affects how long a house design takes?

The time depends on the size and complexity of the house, on the municipality and, above all, on how quickly decisions are made at each stage. Deciding the brief and the budget early, and gathering the information on the land before drawing, is what best avoids going back over things. No timeframes are given, because they vary from case to case.

What affects the cost of construction and the choice of building contractor?

The cost of a house depends on:

  • the location, the size of the plot and the permitted gross floor area;
  • the standard of finishes and the quality and durability of the materials;
  • design and architectural choices;
  • the quality of the workmanship.

The construction works are contracted by you, directly, with the building contractor. Take your time choosing and look for references from houses they have already built. Remember that it is cheaper to do it right the first time than to redo it later. In the building contract (contrato de empreitada), define how additional and omitted works (trabalhos a mais e a menos) are dealt with. Construction supervision (fiscalização de obras), contracted separately by the Client, checks on the Client's behalf that the works comply with the design and the contract.

In a new house, the permitting process is more clearly defined than in a reconstruction: there are no pre-existing structures and surprises tend to be fewer.

How to start: what should I bring to the first meeting?

Gather, if available:

  • the property tax record (caderneta predial) and the location plan of the land;
  • a list of priorities (spaces, atmosphere, budget);
  • references of houses you like and of what you do not like;
  • questions about the land or about the municipality.

With this, it is easier to define the scope of work and take the first steps with confidence.

Frequently asked questions

Can I use a standard design on my land? Only if it complies with the PDM and with the constraints of the plot. It usually requires adaptation and a new permitting process.

What should I do before contacting an architect? Gather the property tax record, the location plan and a list of priorities. It helps define the scope.

Does 3D replace the detail design? No. 3D shows the appearance and the volume; the detail design is the set of drawings, details and specifications from which the house is built.

Does a plot I am interested in always allow building? No. Not every plot allows it; it is best to check viability with an architect and with the municipal council before the purchase.

Photos: Unsplash.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.
Any questions? Talk to us.

Tell us what you need and we will outline the steps, permits and budget to expect.

Request a proposal +