In short
- Ventilation renews the indoor air; air conditioning deals with temperature and, sometimes, humidity; extraction removes smoke, vapours, grease and odours.
- In new buildings and renovations, ventilation and air-conditioning systems must meet the requirements of Decree-Law No. 101-D/2020, as currently in force.
- The project is prepared by engineers or technical engineers with the qualification required by law.
- The right system depends on the building: size, thermal insulation, use and budget.
- Ducts and equipment take up space, so they are integrated into the architecture early on.
What is the ventilation, extraction and air-conditioning project?
It is the technical project that defines the systems responsible for:
- renewing the indoor air;
- removing humidity and pollutants;
- ensuring thermal comfort throughout the year;
- removing smoke and vapours from the interior.
It may include controlled mechanical ventilation (ventilação mecânica controlada, VMC), extraction systems, air-conditioning equipment (such as air-to-air heat pumps or fan coil units) and the networks of ducts, grilles and diffusers that distribute the air. Ministerial Order No. 320/2026/1 calls it the "project for heating, ventilation and air conditioning (HVAC) installations, equipment and systems".
Ducts and equipment tend to be hidden in false ceilings, service shafts and plant areas. The aim of the project is not to be seen, but to ensure the quality of the indoor environment.
When is it required? And who signs it?
Ministerial Order No. 320/2026/1 includes the HVAC project in the list of specialty projects that accompany the building permit and the prior communication of building works. Which projects apply to each set of works depends on the specific operation and is confirmed with the municipal council (Câmara Municipal).
Regardless of the procedure, technical systems, including ventilation and air-conditioning systems, are subject to the requirements of the energy performance of buildings regime (Decree-Law No. 101-D/2020 of 7 December, as currently in force):
- in new buildings, which must be nearly zero-energy buildings;
- in renovations, to the renovated components;
- in major renovations, also to the energy performance requirements of the building.
In works subject to prior control (controlo prévio), compliance is checked in that procedure. In renovations exempt from prior control, compliance is ensured by the building contractor, on the basis of technical documentation.
Engineering specialty projects are prepared by engineers or technical engineers with the qualification required by Law No. 31/2009, as currently in force, and registered with the relevant professional body.
Ventilation: how do you renew the air in a home?
New and rehabilitated homes are increasingly airtight, to improve energy efficiency. Without air renewal, this airtightness can lead to a build-up of humidity, condensation, mould and poorer indoor air quality. A well-sized project ensures continuous air renewal, removing carbon dioxide, water vapour, odours and particles.
In many existing buildings, ventilation is natural or hybrid, with extractor fans in the kitchen and bathrooms. The most common systems are:
- Natural ventilation. Air enters through openings in the facades or in the window frames of the main rooms and leaves through ducts in the kitchens and bathrooms, by natural draught.
- Hybrid ventilation. Combines natural air inlets with mechanical extraction, for example extractor fans in the bathrooms connected to dedicated ducts.
- Mechanical ventilation. Fans ensure continuous, controlled air renewal through ducts. It may be extract-only (single flow) or supply and extract (dual flow). Dual-flow VMC recovers heat from the extracted air, which contributes to energy efficiency and to the building's thermal performance.
Smoke extraction: where is it essential?
In kitchens, garages and some commercial spaces, such as restaurants. Extraction removes cooking fumes, combustion gases, vapours, odours and grease particles. Without a suitable project, smoke, humidity and odours can build up indoors. Depending on the use of the building, for example restaurants or car parks, specific regulatory requirements apply, which the responsible technician identifies.
An extraction system generally includes capture points or hoods, filters, extract ducts, fans and a discharge outlet on the roof or the facade. In multi-family buildings and in restaurant premises, the routing and sizing of the ducts prevent smoke and odours from passing into other units.
Extraction overlaps with the safety of the building; see the fire safety project. If there are gas appliances, it is also coordinated with the gas installation project.
Air conditioning: which systems are there for housing?
Ventilation deals with air quality; air conditioning deals with thermal comfort. It makes it possible to cool in summer, heat in winter, control humidity and distribute the air evenly.
- Air-to-air heat pumps (air conditioning). They heat and cool, with wall-mounted, ceiling or ducted indoor units.
- Fan coil units. They work with hot or cold water, usually produced by a heat pump, and distribute the temperature evenly.
- Systems integrated with ventilation. They combine air conditioning and air renewal, and are common in buildings with high energy performance.
The choice depends on the size of the spaces, the thermal insulation, the type of use and the available budget.
How does it fit with the architecture and the permit procedure?
A common mistake is to deal with ventilation and air conditioning at a late stage. When they are considered from the start, it is possible to:
- define the duct routes and the space for service shafts and false ceilings;
- avoid clashes with the structure;
- position the outdoor units and air outlets without harming the facades;
- integrate the equipment and grilles into the design of the spaces.
Coordination between the architecture project and the engineering specialities avoids changes on site; see the stages of an architectural project. Under Decree-Law No. 555/99, as currently in force, specialty projects are submitted to the municipal council with the building permit (licenciamento) application or after the architecture project has been approved; in the prior communication, they form part of the application itself. The general framework is set out in the engineering specialty projects.
Which good practices matter in a project like this?
- Correct sizing. Undersized or oversized systems cause excessive consumption, discomfort and equipment wear.
- Consistency with energy efficiency: thermal insulation, efficient window frames and renewable energy.
- Maintenance and access. Provide access to the equipment and for cleaning filters and ducts.
- Noise. Choose and position the equipment taking into account the acoustic design.
How do we handle this speciality?
spacelovers is an architecture studio in Lisbon. It carries out the design, handles the permit procedure and provides technical assistance during construction. In our architecture projects, the space for ducts, service shafts and equipment is decided together with the architecture, and the HVAC project is prepared by qualified professionals and coordinated with the other specialities. During construction, we provide technical assistance on the Client's behalf. Decisions and contracts belong to the Client.
How much does it cost?
It depends on the system chosen, the building and the project stage. We prepare a proposal for each case. For construction costs, see the reference values in the renovation cost simulator.
Frequently asked questions
Is a ventilation project mandatory in a renovation?
It depends on the works. Ventilation and air-conditioning systems must meet the requirements applicable to the renovated components and, in major renovations, the energy performance requirements of the building. Whether the project has to be submitted to the municipal council depends on the procedure and the intervention.
What is the difference between ventilation and air conditioning?
Ventilation renews the indoor air; air conditioning controls the temperature and, in some cases, the humidity. They are complementary.
Fan coil units or air conditioning: which is better?
There is no single answer. Air-to-air heat pumps are generally simpler to install; fan coil units, connected to a hydronic system with a heat pump, give a more even temperature distribution. The choice depends on the building and the project.
Why is smoke extraction provided in the kitchen?
To remove smoke, water vapour, grease and odours, improve air quality and prevent humidity from building up.