It depends on the risk category. In urban development operations in the 1st risk category, the fire safety project is waived and replaced by a fire safety sheet (ficha de segurança). In the 2nd, 3rd and 4th categories, a project is mandatory. In a residential building, the 1st category corresponds to a height of up to 9 metres and, at most, one storey below the reference plane.

By Sofia Silva19 January 20257 min read

Fire safety project: full project or fire safety sheet?

In short

  • Fire safety in buildings is governed by the Legal Framework for Fire Safety in Buildings (Regime Jurídico da Segurança Contra Incêndio em Edifícios, RJ-SCIE) (Decree-Law No. 220/2008, as currently in force) and by the Technical Regulation (Regulamento Técnico) (Ministerial Order (Portaria) No. 1532/2008, as currently in force).
  • Each use type (utilização-tipo) of the building is classified in one of four risk categories.
  • In the 1st category, the fire safety sheet replaces the project; in the others, a project is required.
  • In the 2nd to 4th categories, the project is signed by an architect, engineer or technical engineer holding a specialisation certificate in fire safety.
  • The sheet is assessed by the municipal council (Câmara Municipal); the project for the 2nd to 4th categories, by the National Authority for Emergency and Civil Protection (Autoridade Nacional de Emergência e Proteção Civil, ANEPC).

What is the fire safety project?

It is the project that defines a building's fire prevention and fire protection measures. It aims to reduce the risk of fire, limit the spread of fire and smoke, ensure the safe evacuation of occupants and enable intervention by the fire brigade.

The legal framework is the Legal Framework for Fire Safety in Buildings (RJ-SCIE), approved by Decree-Law No. 220/2008 of 12 November, republished by Law No. 123/2019 of 18 October, and the Technical Regulation, approved by Ministerial Order No. 1532/2008 of 29 December, amended by Ministerial Order No. 135/2020 of 2 June. The regime applies to buildings and units (frações), whatever their use.

How is the risk category determined?

The RJ-SCIE classifies each use type in four risk categories: 1st (low risk), 2nd (moderate), 3rd (high) and 4th (very high). The criteria change with the use type. For housing (use type I), what counts is the height and the number of storeys below the reference plane:

CategoryHeight of the use typeStoreys below the reference plane
1stup to 9 mat most 1
2ndup to 28 mat most 3
3rdup to 50 mat most 5
4thmore than 50 mmore than 5

The use type falls into the lowest category whose criteria it fully meets. In a building with several uses (housing and retail, for example), each one is classified by its own criteria.

When is a fire safety project required?

Whenever the urban development operation involves a use type in the 2nd, 3rd or 4th risk category. In practice, the most common cases are:

  • new builds that exceed the limits of the 1st category, such as residential buildings more than 9 metres high or with two or more storeys below the reference plane;
  • renovations or rehabilitations that take the use type to a category above the 1st;
  • extensions that change the risk category, for example by increasing the height or the number of below-ground storeys.

The decision does not depend on whether the works touch stairs or exits, but on the risk category of the use type.

When is a fire safety sheet enough?

In urban development operations in the 1st risk category, the project is waived and replaced by a fire safety sheet, one for each use type, following the model approved by the ANEPC.

The sheet is a simpler document than the project. It identifies the building, characterises the use types and describes, among other aspects, the external conditions, the fire resistance of the building elements, the reaction to fire of the materials, the evacuation conditions, the technical installations and the safety equipment and systems.

For use types IV (schools) and V (hospitals and care homes for the elderly) in the 1st category, the sheet is accompanied by drawings, such as location and site plans and floor plans showing the risk areas, the evacuation routes and the position of the safety equipment.

What does the project contain?

Once the building has been characterised (use types, risk category, areas and proposed intervention), the project defines the safety measures, for example:

  • Fire compartmentation, to limit the spread of fire.
  • Evacuation routes: paths, stairs and exits that are sized and protected.
  • Fire resistance of the structural and compartmentation elements.
  • Reaction to fire of the construction and finishing materials, with the classes required by the Technical Regulation.
  • Conditions for fire brigade intervention: access for emergency vehicles and availability of hydrants.
  • Safety equipment and systems: detection, alarm, smoke control, emergency lighting and signage, and extinguishing means, such as extinguishers, fire hose reel systems or sprinklers, depending on the category.
  • Drawings with the classification of the risk areas, the occupancy of each space and the location of the safety means.

Who signs the project?

In the 2nd, 3rd and 4th risk categories, the project may only be signed by an architect recognised by the Order of Architects (Ordem dos Arquitectos), an engineer recognised by the Order of Engineers (Ordem dos Engenheiros) or a technical engineer recognised by the Order of Technical Engineers (Ordem dos Engenheiros Técnicos), holding a specialisation certificate in fire safety. The ANEPC keeps and publishes the list of these authors.

How does it fit with the architecture and the permit procedure?

Fire safety decisions shape the architecture: where the stairs go, how many exits there are, how spaces are compartmentalised and which materials can be used. The project must be coordinated with the architecture project and with the other specialities, such as the electromechanical installations project (lifts) and the ventilation and smoke extraction project.

Ministerial Order No. 320/2026/1 includes in the list of specialities for the building permit (licença) and the prior communication (comunicação prévia) the "fire safety project for buildings or fire safety sheet, according to the risk category of the building". In the 1st category, the competent body is the municipal council; in the 2nd to 4th categories, it is the ANEPC. When the building is put into use, compliance with the fire safety conditions is declared by a statement of responsibility (termo de responsabilidade) and, in the 2nd to 4th categories, the inspections are attended by a representative of the ANEPC or of an entity accredited by it.

The process follows the building permit procedure (licenciamento) or the prior communication, like the other engineering specialty projects. If in doubt, consult the municipal council in advance (1st category) or the National Authority for Emergency and Civil Protection (ANEPC), in the other categories.

How do we handle this speciality?

spacelovers is an architecture studio in Lisbon. It carries out the design, handles the permit procedure and provides technical assistance during construction. Right at the start of the architecture project, we check the risk category of each use type, because that is what decides between a project and a fire safety sheet. The specialities are prepared by qualified professionals and coordinated with the architecture. During construction, we provide technical assistance on the Client's behalf. Decisions and contracts belong to the Client.

How much does it cost?

It depends on the building, the risk category and the type of intervention. We prepare a proposal for each case.

Frequently asked questions

Does a single-family house need a fire safety project?

As a rule, no. A house up to 9 metres high and with, at most, one storey below the reference plane falls into the 1st risk category, where the fire safety sheet is enough. This is always confirmed case by case.

Can a renovation require a project?

It can, if the intervention raises the risk category of the use type above the 1st. If the category remains the 1st, the fire safety sheet is enough.

Is the fire safety sheet submitted separately?

No. It is submitted to the municipal council together with the other specialities, in the building permit procedure or in the prior communication.

Who assesses the fire safety project?

In the 1st risk category, the municipal council. In the 2nd, 3rd and 4th categories, the ANEPC.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Photo: spacelovers.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.
Any questions? Talk to us.

Tell us what you need and we will outline the steps, permits and budget to expect.

Request a proposal +