In short
- It deals with the collection, conveyance and final discharge of the rainwater that falls on the building and the plot.
- It is a separate specialty project, distinct from the water supply and wastewater project.
- It is sized on the basis of the rainfall intensity of the region where the works are located.
- It follows the General Regulation approved by Regulatory Decree (Decreto Regulamentar) No. 23/95 and the rules of the municipality and of the network operator (entidade gestora).
- It depends on the shape of the building, so it is dealt with early, in coordination with the architecture.
What is the rainwater drainage network project?
It is the project for the building's rainwater drainage network: the set of gutters, pipework, chambers and fittings that collects rainwater, conveys it and directs it to its final discharge point.
In a building, the elements of this network are:
- *eaves gutters and valley or parapet gutters (caleiras e algerozes)* on the roof;
- downpipes and discharge branches;
- inspection chambers and building drains, which carry the water away from the building;
- floor drains and gullies on terraces, patios and outdoor paving.
The building network is, as a rule, connected to the public surface water drainage network. Where there is no public sewer, the final discharge depends on the site and the municipality's rules, and may involve infiltration into the ground or controlled discharge.
When is a rainwater drainage project needed?
Ministerial Order No. 320/2026/1 includes the "rainwater project" in the list of specialty projects that accompany building permit and prior communication applications for building works, separate from the water supply and wastewater project. Which projects apply to each set of works depends on the specific operation. The way this project is presented may also vary from one municipality to another, so it is confirmed with the municipal council (Câmara Municipal) right at the start.
Who prepares the project?
It is prepared by engineers or technical engineers with the qualification required by Law No. 31/2009, as currently in force, and registered with the relevant professional body. The author signs the statement of responsibility (termo de responsabilidade) for their project, and the project coordinator ensures compatibility with the other specialties.
What does the project contain and how is it sized?
The project comprises a descriptive and justificatory report, calculations and drawings: network plans, sections and details.
Sizing starts from the rainfall intensity of the region where the works are located, obtained from intensity-duration-frequency curves. This is used to calculate the flow rates from each surface (roofs, terraces, patios, paving) and, from these, the cross-sections of gutters, downpipes, branch drains and building drains. The network is checked as a whole, adding up the flow rates from the various surfaces.
In larger works or on plots with low drainage capacity, temporary water retention before discharge may be needed.
Which rules apply?
The project follows the General Regulation for Public and Building Water Distribution and Wastewater Drainage Systems (Regulamento Geral dos Sistemas Públicos e Prediais de Distribuição de Água e de Drenagem de Águas Residuais), approved by Regulatory Decree No. 23/95 of 23 August, and the technical standards indicated by the designer, such as EN 12056-3, dedicated to roof drainage.
There are other constraints to consider:
- Municipal and network operator regulations: set the conditions for connection to the public network and what may be discharged.
- Flood control: in certain areas, municipal plans and regulations may impose measures, such as retention basins.
- Soil permeability: some municipal plans, such as the municipal master plan (Plano Diretor Municipal, PDM), set the area of the plot that must remain permeable. The values vary by municipality and by zone.
- Environmental protection: rainwater running off paved surfaces can carry pollutants, and there are rules to protect watercourses and aquifers.
How is it coordinated with the architecture and the licensing process?
Rainwater drainage depends on the shape of the building: roof pitch and type, terraces, patios, paved areas and garden. The position of downpipes and gutters has a direct impact on the façades. That is why the project is coordinated with the architecture project and with the other specialties, particularly the building water supply and drainage networks.
Under Decree-Law No. 555/99, as currently in force, specialty projects are submitted to the municipal council with the licensing (licenciamento) application or after approval of the architecture project; under prior communication, they form part of the application itself. The overall framework is set out under specialty projects and construction licensing projects.
In what stages is it developed?
- Survey: gathering data on the site (rainfall, topography, soil, existing public network).
- Network concept: defining the collection points, the routing and, if necessary, temporary retention.
- Hydraulic sizing: calculating flow rates and cross-sections.
- Licensing: submission to the municipal council with the other specialties.
- *Detail design (projeto de execução):* specifies materials, dimensions and construction details. Without it, many decisions are left to the works and to the building contractor's discretion. See what the detail design includes.
How do we handle this specialty?
spacelovers is an architecture studio in Lisbon. It designs the project, handles the licensing and provides technical assistance during construction. In our architecture projects, the drainage of roofs, terraces and patios is designed together with the architecture, and the specialties are prepared by qualified professionals and coordinated with one another. During the works, we provide technical assistance on the Client's behalf. Decisions and contracts belong to the Client.
How much does it cost?
It depends on the size of the building and the project stage. We prepare a proposal for each case.
Frequently asked questions
Is the rainwater project submitted together with the wastewater project?
Ministerial Order No. 320/2026/1 treats them as separate projects. The way they are presented may vary, so check with the municipal council whether it accepts them together or requires separate projects.
What happens if the street has no public sewer?
The final discharge of rainwater must be resolved within the plot or through another solution accepted by the municipality, for example infiltration into the ground. The specific solution depends on the site, the soil and the municipal rules.
Can I do without the detail design?
It is a decision to take with the design team. Without a detail design, many decisions are left undefined and pass to the works. See what sets each stage apart under architectural project stages.
This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.