Building water supply and drainage networks: what the design includes

Building water supply and drainage network projects define how water reaches the building and the tap and how wastewater leaves it. They are part of the engineering specialty projects and apply to works that interfere with the water supply and wastewater drainage networks.

By Sofia Silva15 August 20236 min read

Building water supply and drainage networks: what the design includes

In short

  • There are two networks: water supply and wastewater drainage.
  • The design includes written and drawn documents (layout, design statement) and sizing calculations.
  • It is prepared by engineers or technical engineers with the appropriate qualifications.
  • It is submitted to the municipal council (Câmara Municipal) in licensing or, in prior communication (comunicação prévia), together with the architecture.
  • Once the pipework has been installed, a hydraulic test is carried out before the wall chases are closed.

What are building water supply and drainage network projects?

They are engineering specialty projects for any urban operation that interferes with the water supply or wastewater drainage networks. The water projects ensure supply with safety and quality; the drainage projects allow wastewater, the so-called foul water, to drain away.

They bring together written and drawn documents, which must be submitted to the competent local entities. They apply to the building permit for new buildings and to the rehabilitation of existing networks.

The layout is defined on the basis of the particular features of the site, respecting the existing conditions and the architectural solutions, and is expressed in the drawings and the design statement (memória descritiva). To these are added the sizing calculations for the supply and drainage systems, in accordance with the technical standards.

When is it needed?

It is one of the engineering specialty projects provided for in Ministerial Order (Portaria) No. 320/2026/1 (Annex V). The project accompanies the application for licensing (licenciamento) or prior communication, and must be coordinated with the architectural design and with the other specialties.

Who prepares the project?

Engineers or technical engineers with competence appropriate to the nature, complexity and size of the project, and with the qualifications required by law, recognised by the Portuguese Association of Engineers (Ordem dos Engenheiros) and the Association of Technical Engineers (Ordem dos Engenheiros Técnicos).

In works subject to prior control (licensing or prior communication), the project is submitted in the municipal application file. In prior communication, it is submitted together with the architectural projects.

How is the water supply network designed?

It follows the General Regulation on Public and Building Water Distribution and Wastewater Drainage Systems (Regulamento Geral dos Sistemas Públicos e Prediais de Distribuição de Água e de Drenagem de Águas Residuais), approved by Regulatory Decree No. 23/95 of 23 August, and standard EN 806-3.

The design starts from the service pressures at the points of use and the reference flow velocity. The building network is fed by the public distribution network. The hydraulic sizing of the internal network takes into account the various fixtures and the consumption each one involves. Hot water production is calculated on the basis of the users' needs and the energy required to heat the estimated volume.

It is also advisable to take into account the EPAL building networks manual, available on its website, in the areas where EPAL is the managing entity.

What materials are used for the pipework?

The materials must resist corrosion, wear and internal pressure, and be compatible with the water and the ground. The most commonly cited are:

  • PEX, multilayer and PPR, the most widely used in internal water networks, for their corrosion resistance and ease of installation; PVC is used mainly in drainage.
  • HDPE (high-density polyethylene), flexible and impact-resistant, suitable for underground installations.
  • Galvanised steel, robust, but more susceptible to internal corrosion over time, which may affect water quality. It is sometimes used for exposed pipework, which is not embedded in the walls.

Hot water branches serving bathrooms and the kitchen should be insulated, with sleeves of thermal insulation material, to reduce heat loss. This should be specified in the design.

How is the wastewater drainage network designed?

It also follows Regulatory Decree No. 23/95. Sizing starts from the design flow rates, obtained from the domestic wastewater flow curve, which reflects consumption and discharge patterns.

The internal diameters of the discharge branches, the shared and individual collector pipes and the building drains are calculated with formulae that take into account pipe roughness and flow characteristics. The stacks, essential for continuous flow, are sized according to the guidance in the annexes to the regulation.

Rainwater has its own network, separate from the wastewater, and its project is submitted with this one or separately, depending on the municipal council; see the rainwater drainage network project.

Why is a hydraulic test carried out on site?

Once all the pipework and isolating valves have been installed, the network undergoes a pressure test, or hydraulic test: the internal pressure of the installation is measured over the period defined in the design and in the applicable regulations. It serves to detect leaks or the need for revision.

Only once the installation is watertight and free of ruptures can the wall chases be closed and the works move on to the following stages. The test is part of the execution of the works, carried out by the building contractor hired by the Client.

How does it fit with the architecture and licensing?

The networks depend on the architecture: the location of bathrooms and kitchens, risers, wall chases and clear heights. It is advisable to know what already exists before designing; see the on-site survey. The overall submission framework is set out in engineering specialty projects, and project coordination helps to coordinate the various disciplines.

How much does it cost?

It depends on the size and complexity of the building and on the design stage. The figures are defined case by case, in the proposal.

Frequently asked questions

Who approves the building networks project?

It is submitted to the municipal council and to the competent local entities, in the licensing or prior communication procedure.

Is the rainwater project part of this project?

It is the project for a separate network of its own, distinct from the wastewater. Depending on the municipal council, it is submitted together with this project or separately. See the rainwater drainage network project.

Can I close the wall chases straight after installing the pipework?

Only after the hydraulic test confirms that the network is watertight.

This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.

Photo: spacelovers.

Sofia SilvaFounder of spacelovers, an architecture and renovation studio in Lisbon.
Any questions? Talk to us.

Tell us what you need and we will outline the steps, permits and budget to expect.

Request a proposal +