In short
- nZEB means nearly zero energy needs, covered to a large extent by renewables; it is not the same as a zero energy balance.
- New buildings must be nZEB (Decree-Law No. 101-D/2020, Article 6).
- The specific requirements are set out in Ministerial Order No. 138-I/2021 (Portaria) (components) and Order No. 6476-E/2021 (Despacho) (building indicators, including the energy class and renewable energy).
- In renovations, the renovated components must meet the requirements; in major renovations, requirements also apply to the building.
- First, the design reduces the energy need; then the rest is produced with renewables.
- The result is decided on site: what is designed has to be built.
What is an nZEB building?
It is a building with very high energy performance: its energy needs are nearly zero or very low and are covered, to a large extent, by energy from renewable sources (Decree-Law No. 101-D/2020, Article 3(d)).
The logic is to reduce consumption first. The design optimises the thermal envelope (walls, roof, floors and openings), controls thermal bridges and makes the most of solar gains. Only then is the remaining energy produced, preferably on site, from renewable sources.
Bioclimatic architecture helps: siting, orientation, openings and shading adjusted to the local climate reduce needs before any equipment is added.
Is nZEB the same as a net zero building?
No. A net zero building (balanço zero) produces, over the year, as much energy as it consumes, measured on site, at source, in cost or in emissions, depending on the criterion chosen. nZEB, as defined in Portuguese law, requires very low needs covered to a large extent by renewables, without imposing a zero balance. A net zero building can be nZEB; an nZEB does not have to be net zero.
Must a new house be nZEB?
Yes. New buildings must be nearly zero energy buildings (Decree-Law No. 101-D/2020 of 7 December, Article 6(1), as currently in force, amended by Decree-Laws No. 102/2021 and No. 11/2025). The regime has applied since 1 July 2021.
The specific requirements are set out in two instruments:
- Ministerial Order No. 138-I/2021 (Portaria), with the requirements for components (envelope and technical systems) of new buildings, renovated buildings and buildings undergoing major renovation;
- Order No. 6476-E/2021 (Despacho), with the requirements at building level: heating and cooling needs, energy class, total primary energy, renewable primary energy and fossil primary energy.
These values may change. Ask the designer for those that apply to your project at the time it is submitted.
And for works on existing buildings?
It depends on the intervention. In a renovated building, the renovated components (for example, windows, roof or wall insulation) are subject to the applicable energy performance requirements (Article 7). In a major renovation, defined in law as works whose estimated cost exceeds 25% of the value of the whole building (Article 3(q)), requirements also apply to the building as a whole (Article 8).
A house renovation is the right opportunity to review the envelope and the systems. See house renovations, building rehabilitation and the article on internal wall insulation.
Is an nZEB a passive house?
Not necessarily. An nZEB meets the regulatory requirements; the passive house follows its own standard and certification, with specific criteria. The two concepts are related: both seek to reduce needs before producing energy.
Are the requirements the same across the country?
No. The requirements depend on the climate zone in which the building is located. They apply, even to a new detached house, to the opaque and glazed envelope and to the technical systems: ventilation, heating and cooling, domestic hot water, lighting and renewable energy production.
To see how these parameters feed into the design, read the article on the energy performance project. For external insulation solutions, see the ETICS system and, for openings, aluminium or PVC windows.
Does an nZEB cost more to build?
As a rule, it calls for more investment in insulation, better-performing window frames and efficient systems. In return, energy needs fall. The comparison should be made as a whole: initial investment, running cost and comfort.
Discussing the subject early, at the concept design stage (estudo prévio), makes it possible to seek, through design, economy of elements and an architecture suited to the place and the climate. For your case, describe your project to us in Request a proposal.
Why are nZEB buildings built?
In the European Union, buildings account for 40% of final energy consumption and 36% of greenhouse gas emissions (Directive (EU) 2024/1275, recital 6). The same directive provides that all new buildings are to be zero-emission buildings by 2030. Its application in Portugal depends on the national legislation transposing it.
Does the design alone guarantee that the building will be nZEB?
No. The design has to be followed on site, and that is what determines the actual performance and the final energy certificate.
Changes arise during construction, some of them proposed by the building contractor. If they are not assessed by the designer, the actual performance may differ from the calculated performance. It is therefore advisable that:
- changes that may affect the insulation, the openings or the systems are assessed by the designer before they are carried out;
- the equipment specified (heating, cooling, hot water, ventilation) is the equipment installed;
- the insulation thicknesses and the specifications of the frames and glazing are those designed.
spacelovers is an architecture studio: it produces the design, coordinate the engineering specialities, handle the licensing and provide technical assistance during construction, checking that the works follow the design. The Client hires the building contractor directly; decisions and contracts belong to the Client. See also our new build page.
Frequently asked questions
Does an nZEB house have to have solar panels?
It has to meet the renewable primary energy requirements set in Order No. 6476-E/2021. The solution (solar photovoltaic, solar thermal, heat pump or another) is decided in the design, once needs have been reduced.
What if the works change what was in the design?
Performance may differ from the calculated performance and be reflected in the energy certificate. Ask the designer to assess the changes before they are carried out.
Does an existing building have to be nZEB?
Not in every case. In a renovation, the renovated components must meet the applicable requirements; in a major renovation, requirements also apply to the building. The thermal performance designer will tell you what applies to your works.
Where is the legal definition of nZEB?
In Decree-Law No. 101-D/2020 of 7 December, Article 3(d), as currently in force.
This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.