In short
- A landscape architecture project deals with the outdoor space as a whole, not just the choice of plants.
- In the licensing process, what the law requires is an external works project, when there is a private outdoor area.
- Landscape architecture projects are prepared by landscape architects registered with the relevant professional association.
- Swimming pools attached to the house, walls above a certain height or next to the public road, and significant changes to the ground are subject to prior communication (comunicação prévia) or to a building permit (licença).
- The earlier the outdoor space is considered together with the architecture, the better the house relates to the site.
What is a landscape architecture project?
It is the project that organises the outdoor space of a building: where the seating areas go, how people move around, what materials are used underfoot, which species are planted and how water is collected and drained. It is not just about planting trees. It starts from the site, the climate and the way the Client wants to live in the space.
In larger works, it includes support structures and features such as fountains, swimming pools, ponds, reflecting pools, vertical gardens, green roofs and sports areas.
When is a landscape architecture project needed?
In the licensing of building works, the ministerial order that sets out the elements of the application (Ministerial Order (Portaria) No. 320/2026/1, in force since 1 October 2026) includes, among the specialty projects (projetos de especialidades), the *external works project (projeto de arranjos exteriores), where there is a private outdoor area*. It is a simpler project, describing the green areas, the paved areas and the permeable and impermeable areas.
A landscape architecture project, with the full design of the outdoor space, is the Client's choice or may be required in cases indicated by the municipality, for example in a municipal regulation or plan. Check the rules of your municipality with the design team.
Which outdoor works need a permit?
Not all outdoor works require a permit. Some are works of minor urban-planning significance (obras de escassa relevância urbanística), exempt from prior control (controlo prévio), such as boundary walls up to 1.8 m high that do not adjoin the public road. The municipality may set more restrictive rules, and the exemption does not apply to listed buildings (imóveis classificados) or within their protection zones.
Swimming pools attached to a house follow, as a rule, the prior communication procedure; in classified properties, in their protection zones or in areas with public-interest easements or restrictions (servidões ou restrições de utilidade pública), they may be subject to a permit. Higher walls, walls next to the public road and ground remodelling works are subject to prior communication or to a permit, depending on the case (Decree-Law No. 555/99, as currently in force, Articles 4 and 6-A). Check your case before going ahead; see also works exempt from prior control.
Who signs the landscape architecture project?
The law on the qualifications of technical professionals (Law No. 31/2009, as currently in force) provides that projects in the landscape architecture specialty are prepared by landscape architects registered with the relevant professional association. As with any specialty, the project is accompanied by the author's statement of responsibility (termo de responsabilidade).
When it designs the architecture project, spacelovers coordinates it with the specialty projects, including the one for the outdoor space.
What does a landscape architecture project contain?
The content grows as the project progresses. In general, it is developed in three stages.
Concept design (estudo prévio): getting to know the site and the Client
This is the stage of understanding how the Client imagines the outdoor space (space for children, a vegetable garden, a seating area, shade) and of analysing the site:
- topography, soil type, drainage, sun exposure and prevailing winds;
- existing vegetation: trees to preserve and invasive species to remove;
- environmental and urban context, and relationship with the surrounding landscape.
This produces a concept: the character of the space (for example, Mediterranean, contemporary or rustic), the organisation into zones, circulation, water features and a planting palette justified by adaptation to the climate and by maintenance.
Licensing: what is submitted
At the licensing stage, the external works project accompanies the application with the elements required by the ministerial order in force and by the municipality, including the author's statement of responsibility. The project must comply with the municipal master plan (Plano Diretor Municipal, PDM) and the municipal regulations, which may impose conditions, for example on permeable areas or the preservation of natural features.
Detail design (projeto de execução): how it is built
It specifies the works and materials for each solution:
- Drainage and irrigation: solutions to prevent flooding and efficient irrigation systems.
- Materials: outdoor paving and structures such as pergolas and walls.
- Lighting: types of light fittings and the points to be lit, such as paths and trees.
- Phasing of the works: ground preparation, construction of structures and planting.
How does it relate to the architecture project?
The best result comes from working on the outdoor space together with the house. The architecture defines the building and the landscape design extends its ideas outdoors, with spaces that respond to the same concept.
That is why coordination between projects is decisive. Ground levels, access, walls, water and trees shape the siting and design of the house, and the reverse is also true. See how we work on architecture projects.
In the licensing process, external works appear in the list of specialty projects. See also what changes in the licensing of a single-family house and, for the procedures, the building permit page.
There is a direct link with other specialties: drainage and rainwater collection overlap with the rainwater drainage network project, and removing existing buildings or walls may involve demolition; see the demolition project.
Knowing the site before designing avoids wrong decisions. See the on-site survey.
And after the project? Construction and maintenance
On site, the typical tasks are ground preparation (removal of rubble and soil improvement), installation of irrigation, construction of structures and planting. Decisions and contracts belong to the Client, who hires those carrying out the works directly. spacelovers provides technical assistance during construction, on the Client's behalf, checking that the works follow the design.
At the end, it is useful to have a maintenance plan setting out how often to water, prune and fertilise, and when to replace species.
How much does a landscape architecture project cost?
It depends on the size of the space, the complexity of the design and the stages commissioned. For a fee tailored to your site, request a proposal.
Frequently asked questions
Does a single-family house always need a landscape architecture project?
Not always. In the licensing process, the law provides for an external works project when there is a private outdoor area. A full landscape architecture project depends on the Client's wishes or on a requirement of the municipality. Check with the design team.
What is the difference between external works and landscape architecture?
External works describe, in general terms, the green areas, the paved areas and the permeable or impermeable areas. Landscape architecture develops the concept of the outdoor space in more detail: zones, circulation, species, water, materials and lighting.
Can I build a swimming pool or a wall without a permit?
It depends. Boundary walls up to 1.8 m that do not adjoin the public road are, as a rule, exempt from prior control, but the municipality may impose more restrictive limits. Swimming pools attached to a house follow, as a rule, the prior communication procedure; in classified properties, in their protection zones or in areas with easements, they may be subject to a permit. Higher walls, walls next to the public road and significant changes to the ground are subject to prior communication or to a permit. Check before you start.
Is the landscape design decided before or after the house design?
Ideally, it is considered at the same time, from the concept design stage, because levels, access and existing trees influence the siting.
This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.