In short
- The reclassification of rural land as urban land for housing is a municipal decision, made through a simplified amendment of the PDM.
- The land must be contiguous to urban land, have existing or guaranteed infrastructure and be compatible with the local housing strategy.
- Classified areas, several types of National Ecological Reserve (Reserva Ecológica Nacional, REN) land and the best soils of the National Agricultural Reserve (Reserva Agrícola Nacional, RAN) are excluded.
- At least 70% of the above-ground gross floor area must be allocated to public housing, affordable rental or controlled-cost housing.
- The works must be carried out within the set period; if they are not, the classification as urban land lapses.
What has changed in the use of rural land?
Decree-Law No. 117/2024 amended the Legal Framework for Territorial Management Instruments (Regime Jurídico dos Instrumentos de Gestão Territorial, RJIGT, Decree-Law No. 80/2015 of 14 May) to increase the supply of land for housing. Law No. 53-A/2025, resulting from parliamentary review (apreciação parlamentar), amended that regime.
The central mechanism is the reclassification of rural land as urban land through a simplified amendment of the PDM, for housing purposes and complementary uses.
Which land can be reclassified?
The possibility is not unlimited. Reclassification requires, cumulatively:
- contiguity with urban land;
- a delimited execution unit (unidade de execução);
- existing or guaranteed general and local infrastructure;
- compatibility with the local housing strategy (estratégia local de habitação), the municipal housing charter (carta municipal de habitação) or the housing pool (bolsa de habitação), where these exist;
- the minimum allocation of the gross floor area to affordable housing (see below).
Excluded, among others, are areas within the National System of Classified Areas (Sistema Nacional de Áreas Classificadas), the coastline and areas at significant risk of flooding, several types of REN land (such as beaches, dunes, cliffs, watercourses, flood-threatened areas, aquifer recharge areas and areas at risk of erosion or slope instability) and, within the RAN, the soils in the classes with the greatest agricultural suitability. As a rule, the municipality must also demonstrate the impact on infrastructure and the economic and financial viability of the operation.
What percentage has to be affordable housing?
At least 70% of the total above-ground gross floor area must be allocated to public housing, affordable rental (arrendamento acessível) or controlled-cost housing (habitação a custos controlados). This obligation is entered in the land register (registo predial).
Who decides and how does reclassification work?
Reclassification is a municipal procedure: the owner of a rural plot does not decide it, but can find out from the municipal council (Câmara) whether there is a proposal for the area. Each municipality decides whether and where to reclassify, so what happens in one municipality may differ from what happens in another.
Stages of the process
- *Proposal by the municipal council (câmara municipal)*, with the delimitation of the area and the required justification.
- *Opinion of the Regional Coordination and Development Commission (Comissão de Coordenação e Desenvolvimento Regional, CCDR)*, non-binding, where the land is not exclusively public.
- Public consultation, in which citizens and organisations can take part.
- *Approval by the Municipal Assembly (Assembleia Municipal), through a simplified amendment of the PDM, published in the Official Gazette (Diário da República*).
- Land registration, arranged by the municipal council, with the deadlines for carrying out the works and the allocation to affordable housing.
Which obligations are attached to reclassified land?
- Execution period: the urbanisation works must be carried out within the period set by law, which may be extended once only for exceptional reasons and only if the works have already begun. If they are not carried out, the classification as urban land lapses, wholly or partly.
- Entry in the register: transfers of properties or units without the entry and registration in the land register are voidable.
- Municipal pre-emption: the municipality has a right of pre-emption (direito de preferência) on transfers after the first one.
Anyone buying land that has already been reclassified should first confirm the conditions recorded in the land register and in the municipal file. See what to check when buying land.
Can agriculture and housing coexist?
This is one of the most sensitive points of the regime: reconciling the protection of agricultural and environmentally sensitive soils with an increase in the supply of housing. That is why the law excludes several types of REN land and the RAN classes with the greatest suitability, and the areas that remain in the REN or RAN keep that regime.
Does the review simplify permitting?
The Land Law simplifies the amendment of the PDM, not the permitting of the works. Permitting follows the Legal Framework for Urbanisation and Building (Regime Jurídico da Urbanização e da Edificação, RJUE) (Decree-Law No. 555/99, as currently in force), revised by Decree-Law No. 108/2026, in force since 1 October 2026. See the new RJUE and building permits.
What challenges arise?
Implementation depends on the technical and administrative capacity of each municipality and on compliance with the execution deadlines. For anyone who owns or is looking for a plot, it is worth following what the municipality intends and not assuming that a reclassification will happen.
What should I check before buying a rural plot?
Building on a rural plot is always subject to the territorial plans, the regulations and the restrictions on each plot. Before deciding:
- Confirm the land classification in the zoning plan (planta de ordenamento) and in the PDM regulations.
- Identify the restrictions that apply to the land (REN, RAN, easements) and what can be built on it.
- Consider a prior information request (pedido de informação prévia) to the municipal council, to find out what is admissible before investing in the design.
- Involve a qualified technician from the start, to assess the building viability. See our architecture projects.
The guide to building a house explains the stages of a house project, from the land to the permitting. If you are thinking about tourist accommodation outside the city, also read about rural tourism.
Frequently asked questions
Can I build a house on a rural plot?
It depends on the territorial plans, the regulations and the restrictions that apply to the land. Consult the PDM and, if necessary, submit a prior information request to the municipal council before buying.
Can I ask the municipal council to reclassify my land?
Reclassification is decided by the municipality, through an amendment of the PDM, and only for housing under the conditions set by law. Ask the municipal council whether there is a proposal for the area.
Are these rules already in force?
Yes. The regime is set out in Decree-Law No. 117/2024 of 30 December, as amended by Law No. 53-A/2025 of 9 April. Always confirm the text in force before making any decision.
This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.