In short
- The stability project deals with the structure: actions, foundations, materials and sizing.
- In the official list of specialty projects (projetos de especialidades), the stability project includes excavation and peripheral containment.
- It is required for new build and when works on an existing building affect its stability, even if the interior works are exempt from a building permit (licença).
- It is prepared by qualified engineers or technical engineers, registered with the relevant professional body.
- It requires coordination with the architecture from the earliest stages.
What is the structural stability project?
It is the technical and regulatory analysis of a building's structure, whether new build or existing. It considers the actions to which the building is subject: self-weight, imposed loads, wind, snow and earthquakes.
It includes the design and sizing of the foundations and structural elements (slabs, beams, columns, load-bearing walls) and the choice of materials. The aim is to ensure the safety and durability of the building throughout its service life.
What is the excavation and peripheral containment project?
It is the technical study that defines how the ground is excavated and how the ground and adjoining buildings are retained at the various stages of the works. Peripheral containment brings together the solutions that prevent landslides or excessive deformation during excavation, for example to create basements or deep foundations.
In the ministerial order that sets out the elements of planning applications (Ministerial Order (Portaria) No. 320/2026/1, in force since 1 October 2026), the list of specialties provides for a "stability project that includes the excavation and peripheral containment project". In demolition, the containment of adjoining buildings or façades accompanies the application; see the demolition project.
When is a structural stability project needed?
- In new build (houses or buildings): the stability project is one of the specialties for building works. See the guide to building a house.
- When a structural alteration is planned in an existing building, in renovations or rehabilitations. Even when the interior works are exempt from a permit, if they affect stability the law requires a stability project and a statement of responsibility (termo de responsabilidade) from a qualified professional (and a seismic strengthening project, where mandatory), submitted to the municipal council (Câmara Municipal) with the notice of commencement of works (Decree-Law No. 555/99, as currently in force, Article 6).
- In the legalisation of works already carried out, the municipal council may ask for specialty projects and statements of responsibility, such as the stability one, where safety so requires. See the legalisation of existing buildings.
The stability project is a technical document that is in the Client's interest even when it is not required: it is the way to know, before the works, what the structure can bear.
Who signs these projects?
They are prepared by engineers or technical engineers with the qualification required by law for the works in question (Law No. 31/2009, as currently in force) and registered with the relevant professional body, the Order of Engineers (Ordem dos Engenheiros) or the Order of Technical Engineers (Ordem dos Engenheiros Técnicos). The author signs the statement of responsibility.
The excavation and containment project sometimes involves a multidisciplinary team, including geotechnical specialists.
What does the structural stability project contain?
The project is accompanied by the author's statement of responsibility and includes written documents (descriptive and justificatory report and calculations) and drawings, with the content and scales that the works and the municipality require. The professional will tell you what applies to your case.
In technical terms, it includes the quantification of actions, the choice of materials, the structural concept, the sizing (with verification of internal forces and deformations), the foundations and the construction details.
What does the excavation and peripheral containment project contain?
- Geotechnical characterisation: type of ground, strength and bearing capacity, and groundwater level.
- Excavation: depth, geometry and phasing.
- Containment solutions: for example, retaining walls, pile walls or ground anchors.
- Bracing and reinforcement: props, capping beams and other elements that stabilise the containment at each stage.
- Water control and monitoring: drainage or lowering of the water table, where necessary, and monitoring of movement in neighbouring buildings.
- Safety: measures to protect workers and people near the site.
Where there is technical complexity, the detail is defined in the detail design (projeto de execução).
How does it relate to the architecture project and the licensing process?
The stability project always starts from the architecture project. The architecture is the starting point and the final objective: engineering must ensure that the spaces are safe and stable, and architecture that the structural solution is compatible with the design, use and expression of the building.
In existing buildings, adjustments to the project may be needed. That is why the engineer should be involved as early as possible, at the concept design (estudo prévio) stage. In works of greater structural complexity, solutions are found more easily when structure and architecture work together. See how we work on architecture projects.
In the licensing process (licenciamento), the specialty projects are submitted with the application or after approval of the architecture project; under prior communication (comunicação prévia), they form part of the application. See the building permit page and the article on specialty projects.
spacelovers is an architecture studio in Lisbon: it designs the project, handles the licensing and provides technical assistance during construction. When it designs the architecture project, spacelovers coordinates it with the specialty projects, including structural stability.
What changes in new build, renovation and rehabilitation?
- New build. The structure is considered from the outset. Where there are basements or deep foundations, excavation and containment protect the ground and neighbouring buildings.
- Renovations. The engineer assesses the capacity of the existing structure and proposes solutions for the alterations, such as strengthening beams, columns or foundations. Opening up load-bearing walls or removing walls are examples that require this assessment. See apartment renovation.
- Rehabilitation. In old or deteriorated buildings, the condition of the structure is assessed and strengthening or replacement of damaged elements is proposed. See our building rehabilitation service, the article on urban rehabilitation and façade reconstruction.
What about the seismic vulnerability study?
It is a report on how the building behaves in earthquakes, with proposals to improve safety. In certain extension, alteration or reconstruction works, the law requires it. See the seismic vulnerability assessment. Knowing the building before designing also helps: see the on-site survey.
How much does a structural stability project cost?
It depends on the type of works, the structural complexity, whether there is excavation and containment, and the stages commissioned. For a fee tailored to your works, request a proposal.
Frequently asked questions
Can I alter a wall without a structural stability project?
If the alteration modifies the existing structure or the behaviour of the overall structure, a stability project and a statement of responsibility from a qualified professional are needed, even if the interior works are exempt from a permit. Ask for a technical opinion before any intervention.
What is the difference between structural stability and peripheral containment?
Stability deals with the building's structure. Peripheral containment deals with the ground and neighbouring buildings during excavation. In the official list of specialties, containment is part of the stability project.
Who can sign the structural stability project?
Qualified engineers or technical engineers, registered with the Order of Engineers or the Order of Technical Engineers, with the qualification required by law for the works.
Is the stability project done before or after the architecture?
It starts from the architecture. In the licensing process, it may be submitted with the application or after approval of the architecture project; under prior communication, it forms part of the application.
This content is for information only and does not constitute legal advice. For your specific situation, legal advice should be provided by a qualified professional in the field.