Building rehabilitation in central Moscavide.
Building rehabilitation · Moscavide
Full renovation of a multi-family building with five units in central Moscavide, very close to the Metro.

- Area
- 400 m²
- Year
- 2026
- Type
- Building rehabilitation
- Location
- Moscavide
Loures - Scope
- Architectural design, Project coordination, Topography and Architectural Survey
Summary
Rehabilitation of a 400 m² multi-family building in central Moscavide, Loures, at scheme design stage. The aim is the full renovation of the building, with five self-contained units, to bring it onto the rental market.
01 — The starting point
The starting point
The building is in central Moscavide, very close to the Metro station. It has five self-contained units, and the ground floor has a rear yard.
The aim of the design is the full renovation of the building, improving living conditions and functionality, to bring it onto the rental market.
02 — Interiors
Interiors
The interiors are designed to provide the greatest functionality and durability, because the purpose of the renovation is to bring the units onto the rental market. Light tones and washable, hard-wearing materials guide the choice of finishes.
Read more about the project
03 — The intervention
The intervention
The design provides for the full renovation of the interiors of the units, with new kitchens, new bathrooms and all the other interior spaces.
On the outside, it provides for the rehabilitation of the façades and the roof, including the rooflight, which brings a light tunnel to the building's common staircase.
04 — Façades and roof
Façades and roof
On the roof, waterproofing failures were found at the junctions with the chimney, the rooflight and the parapets, along with badly deteriorated, broken and lifted roof tiles.
The façades show render detachment and surface cracking, which in many cases is already causing water ingress inside. The design provides for remedying these defects with corrective and preventive measures.
Gallery
Project images
Frequently asked questions
Questions about this project
What stage is this project at?
At scheme design stage, dated 2026.
Does the intervention include the rehabilitation of the façades and the roof?
Yes. The design provides for correcting the waterproofing failures on the roof and the render detachment and cracking on the façades, with corrective and preventive measures.
Are there situations to be regularised in the Moscavide building?
Yes. The project includes updating the building's records.
What did spacelovers do on the Moscavide building?
The architectural design, the project coordination and the topography and architectural survey. To request a proposal for your building, use the "Request a proposal" button.
Client testimonials
What our Clients say.
Client reviews on Google
Client reviews on Google
A selection of published reviews, shown as in the original. See all reviews on Google (4.8 · 47 reviews) ↗
Other projects of the same type
Building rehabilitation
See also: Building rehabilitation · Projects and works in other areas.










Building rehabilitation in Sesimbra
Building rehabilitation in Pena
Building rehabilitation in Bairro da Ajuda