Building rehabilitation in Bairro da Ajuda, Lisbon.
Building rehabilitation · Building rehabilitation
Rehabilitation of a residential building in Bairro da Ajuda, Lisbon, with an upward extension and partial demolition.

- Area
- 170 m²
- Year
- 2026
- Type
- Building rehabilitation
- Location
- AjudaLisbon
Summary
Rehabilitation of a residential building in Bairro da Ajuda, Lisbon, with an upward extension and partial demolition. The main façade is kept and the building will have two dwellings, a one-bedroom (T1) apartment with a garden and a two-bedroom (T2) duplex. spacelovers developed the design.
01 — The starting point
The starting point
This rehabilitation, in Bairro da Ajuda, Lisbon, included a building permit procedure for extension works, with demolition, under Article 4 of the RJUE (Decree-Law no. 555/99, as currently in force). The building is exclusively residential.
It had a five-room dwelling, across floor 1, with access to the garden, and floor 2, in the attic. There were interior bedrooms with no ventilation or natural light, and two bathrooms. As no drawings existed, a measured survey of the existing building was carried out and served as the basis for the design. The property offered poor living conditions and had defects: structural deformation in the roof and floors, water ingress through the roof and by capillary action, and inadequate ventilation. In the rear yard there was a small outbuilding of no architectural character, and the ground was entirely paved, with no permeability.
02 — The decision that made the difference
The decision that made the difference
Extending upwards to create one more dwelling
The aim is to extend the building upwards to create one more dwelling. The main façade and the side gable walls are kept; the rear façade, the interior and the roof are demolished and rebuilt.
The building had interior bedrooms with no ventilation or natural light, and the new structure is designed to respond to the requirements for overall strength and seismic vulnerability, energy improvement and the modernisation of the building services.
03 — The intervention
The intervention
The aim is to extend the building upwards to create one more dwelling. On floor 1, the design proposes a T1 with a back garden and, on floors 2 and 3, a T2 duplex, with terraces reached through dormers.
The main façade and the side gable walls are kept. The rear façade, the interior and the roof are demolished and rebuilt, to align with the adjoining buildings, address the seismic safety and legal requirements, enhance the ensemble and improve accessibility. The new structure is designed to respond to the requirements for overall strength and seismic vulnerability, energy improvement and the modernisation of the building services.
Read more about the project
04 — The façade
The façade
The main façade keeps its traditional character, with a simpler, more contemporary design, and the building stands within the special protection zone of listed buildings. The structural openings and the stone dressings (cantarias), now rendered and painted, are kept: the render is carefully removed to reveal the natural stone. The stone dressings from the rear façade will be reused in the new openings on floor 2, in visual continuity with those on floor 1.
The rhythm of openings and piers (vão e nembo), the proportion of solid to void and the parapet, with a horizontal frieze, are kept. External thermal insulation (ETICS) is applied only to the new façades; on the main façade, insulation is applied from the inside.
05 — Roof and dormers
Roof and dormers
The roof keeps its two-pitch configuration. Three dormers are introduced, ending in a continuous terrace, as in other buildings in the surrounding area, and on the street-facing pitch one dormer with a small terrace is kept, with a simpler, more contemporary design. The dormers are clad in natural-colour zinc and follow the rhythm of the openings on the main façade.
Gallery
Project images
Frequently asked questions
Questions about this project
How do you extend an old building while keeping the main façade?
The main façade and the side gable walls are kept, and the rear façade, the interior and the roof are demolished and rebuilt with a new structure. In this building, the main façade keeps the rhythm of openings and piers, the proportion of solid to void and the parapet.
How many dwellings does the building have after the intervention?
Two: a T1 on floor 1, with a garden, and a T2 duplex on floors 2 and 3. It goes from one dwelling to two, which means one new dwelling is created.
What happens to the stone dressings?
Those on the main façade are kept, with the render removed to reveal the natural stone, and those on the rear façade are reused in the new openings on floor 2.
Why is the rear façade demolished?
To align with the adjoining buildings, address the seismic safety and legal requirements, enhance the ensemble and improve accessibility.
What did spacelovers do in Bairro da Ajuda?
The architectural design and the building permit for the rehabilitation of this building and project management.
Client testimonials
What our Clients say.
Client reviews on Google
Client reviews on Google
A selection of published reviews, shown as in the original. See all reviews on Google (4.8 · 47 reviews) ↗
Request a proposal
Would you like a project like this? Let's talk about your property.
Other projects of the same type
Building rehabilitation
See also: Building rehabilitation · Projects and works in Lisbon.









Building rehabilitation in Bairro Alto
Building rehabilitation in Arroios
Building rehabilitation in Pena